IAC logo
IAC Assessment: SU0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Cable TV Filters
NAICS 334220 - Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663 - Radio & Tv Communications Equipment
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 31,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,381 1,078,218 kWh $0.07
Electricity Demand $50,764 3,266 kW-months/year $15.54
Electricity Fees $3,079 - $ -
Natural Gas $4,731 535 MMBtu $8.84
TOTAL ENERGY COSTS $135,355
RECOMMENDED SAVINGS* $11,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $131
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$387
Cost:
-
$387 5,924 - - - - - - $387
5,924
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$131
Cost:
-
- - - - - - $131 - -
-
kWh
-
-
kW-months/year
-
-
$
$131
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$533
Cost:
$197
$143 2,184 $47 3 $264 - $79 - $143
2,184
kWh
$47
3
kW-months/year
$264
-
$
$79
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,819
Cost:
$1,200
$(-28) (-435) $(-559) (-36) $968 - $1,438 - $(-28)
(-435)
kWh
$(-559)
(-36)
kW-months/year
$968
-
$
$1,438
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$142
Cost:
$218
$142 2,179 - - - - - - $142
2,179
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$222
Cost:
$570
$222 3,407 - - - - - - $222
3,407
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$430
Cost:
$1,454
$430 6,581 - - - - - - $430
6,581
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$103
Cost:
$440
$63 972 $40 3 - - - - $63
972
kWh
$40
3
kW-months/year
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,340
Cost:
$37,030
$4,459 68,289 $2,881 185 - - - - $4,459
68,289
kWh
$2,881
185
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,107
Cost:
$41,109
$5,818 89,101 $2,409 155 $1,232 - $1,648 - $5,818
89,101
kWh
$2,409
155
kW-months/year
$1,232
-
$
$1,648
-
$
TOTAL IMPLEMENTED Savings:
$131
Cost:
-
- - - - - - $131 - -
-
kWh
-
-
kW-months/year
-
-
$
$131
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost