Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Point of Sale Equipment
NAICS 334118 - Computer Terminal and Other Computer Peripheral Equipment Manufacturing
SIC 3578 - Calculating And Accounting Equipment
Sales $100,000,000-$500,000,000
# of Employees 90
Plant Area (Sq.Ft.) 70,000
Annual Production 30,000 Pieces
Production Hrs. Annual 2,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,804 439,086 kWh $0.05
Electricity Demand $12,472 1,548 kW-months/year $8.06
Natural Gas $18,157 1,757 MMBtu $10.33
TOTAL ENERGY COSTS $72,683
RECOMMENDED SAVINGS* $19,995 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,288
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,908
Cost:
-
- - - - - - - - $3,908 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,908
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,326
Cost:
-
$1,326 25,545 - - - - - - - - $1,326
25,545
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$952
Cost:
-
- - - - - - - - $952 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$952
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$820
Cost:
$280
$273 5,256 $58 7 - - $348 - $141 - $273
5,256
kWh
$58
7
kW-months/year
-
-
MMBtu
$348
-
$
$141
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,357
Cost:
$5,371
$(-449) (-8,650) $(-96) (-12) $4,902 474 - - - - $(-449)
(-8,650)
kWh
$(-96)
(-12)
kW-months/year
$4,902
474
MMBtu
-
-
$
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$426
Cost:
$777
$426 8,214 - - - - - - - - $426
8,214
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,282
Cost:
$6,008
$(-33) (-636) - - $2,315 224 - - - - $(-33)
(-636)
kWh
-
-
kW-months/year
$2,315
224
MMBtu
-
-
$
-
-
$
08: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$5,924
Cost:
$18,000
$(-23) (-434) $(-419) (-52) - - - - $6,366 - $(-23)
(-434)
kWh
$(-419)
(-52)
kW-months/year
-
-
MMBtu
-
-
$
$6,366
-
$
TOTAL RECOMMENDED Savings:
$19,995
Cost:
$30,436
$1,520 29,295 $(-457) (-57) $7,217 698 $348 - $11,367 - $1,520
29,295
kWh
$(-457)
(-57)
kW-months/year
$7,217
698
MMBtu
$348
-
$
$11,367
-
$
TOTAL IMPLEMENTED Savings:
$9,288
Cost:
$6,288
$1,566 30,165 $58 7 $2,315 224 $348 - $5,001 - $1,566
30,165
kWh
$58
7
kW-months/year
$2,315
224
MMBtu
$348
-
$
$5,001
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost