Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2012 |
Principal Product | Folding Cartons |
NAICS | 322212 - Folding Paperboard Box Manufacturing |
SIC | 2657 - Folding Paperboard Boxes |
Sales | $50,000,000-$100,000,000 |
# of Employees | 361 |
Plant Area (Sq.Ft.) | 318,000 |
Annual Production | 450,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $31,558 | 300,511 | kWh | $0.11 |
Natural Gas | $902,563 | 139,891 | MMBtu | $6.45 |
TOTAL ENERGY COSTS | $934,121 | |||
RECOMMENDED SAVINGS* | $98,038 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $77,843 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,463 Cost: - |
$5,463 | 52,020 | - | - | - | - | - | - | - | - |
$5,463 52,020 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $8,393 Cost: $2,291 |
$8,393 | 79,937 | - | - | - | - | - | - | - | - |
$8,393 79,937 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $148 Cost: $59 |
$76 | 725 | - | - | $46 | - | - | - | $26 | - |
$76 725 kWh |
- - MMBtu |
$46 - $ |
- - $ |
$26 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,743 Cost: $2,736 |
$(-482) | (-4,586) | $5,225 | 810 | - | - | - | - | - | - |
$(-482) (-4,586) kWh |
$5,225 810 MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $8,342 Cost: $8,640 |
$(-195) | (-1,860) | - | - | - | - | $778 | - | $7,759 | - |
$(-195) (-1,860) kWh |
- - MMBtu |
- - $ |
$778 - $ |
$7,759 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,568 Cost: $7,264 |
$6,568 | 62,554 | - | - | - | - | - | - | - | - |
$6,568 62,554 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,280 Cost: $3,077 |
$2,280 | 21,715 | - | - | - | - | - | - | - | - |
$2,280 21,715 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $542 Cost: $732 |
$542 | 5,163 | - | - | - | - | - | - | - | - |
$542 5,163 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $61,559 Cost: $262,789 |
- | - | $61,559 | 9,544 | - | - | - | - | - | - |
- - kWh |
$61,559 9,544 MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,038 Cost: $287,588 |
$22,645 | 215,668 | $66,784 | 10,354 | $46 | - | $778 | - | $7,785 | - | $22,645 215,668 kWh |
$66,784 10,354 MMBtu |
$46 - $ |
$778 - $ |
$7,785 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $77,843 Cost: $268,216 |
$16,212 | 154,397 | $61,559 | 9,544 | $46 | - | - | - | $26 | - | $16,212 154,397 kWh |
$61,559 9,544 MMBtu |
$46 - $ |
- - $ |
$26 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost |