IAC logo
IAC Assessment: SU0328
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0328
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Cryogenic Refrigeration Equipment
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 42,248
Annual Production 575 Pieces
Production Hrs. Annual 4,290
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,450 2,629,430 kWh $0.05
Electricity Demand $43,405 5,756 kW-months/year $7.54
Electricity Fees $6,874 - $ -
Natural Gas $7,714 767 MMBtu $10.06
TOTAL ENERGY COSTS $195,443
RECOMMENDED SAVINGS* $26,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,325
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$164
Cost:
-
$117 2,231 $47 6 - - - - $117
2,231
kWh
$47
6
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,399
Cost:
$1,890
- - $5,399 716 - - - - -
-
kWh
$5,399
716
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$678
Cost:
$611
$678 12,972 - - - - - - $678
12,972
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,336
Cost:
$4,060
$(-63) (-1,200) $(-271) (-36) - - $4,670 - $(-63)
(-1,200)
kWh
$(-271)
(-36)
kW-months/year
-
-
MMBtu
$4,670
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,923
Cost:
$2,382
- - - - $1,923 191 - - -
-
kWh
-
-
kW-months/year
$1,923
191
MMBtu
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$309
Cost:
$758
$309 5,904 - - - - - - $309
5,904
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$13,560
Cost:
$54,280
- - - - - - $13,560 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,560
-
$
TOTAL RECOMMENDED Savings:
$26,369
Cost:
$63,981
$1,041 19,907 $5,175 686 $1,923 191 $18,230 - $1,041
19,907
kWh
$5,175
686
kW-months/year
$1,923
191
MMBtu
$18,230
-
$
TOTAL IMPLEMENTED Savings:
$16,325
Cost:
$57,273
$795 15,203 $47 6 $1,923 191 $13,560 - $795
15,203
kWh
$47
6
kW-months/year
$1,923
191
MMBtu
$13,560
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost