IAC logo
IAC Assessment: SU0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2013
Principal Product Digital Imaging Papers and Specialty Papers
NAICS 322299 - All Other Converted Paper Product Manufacturing
SIC 2672 - Paper Coated And Laminated, Nec
Sales $50,000,000-$100,000,000
# of Employees 143
Plant Area (Sq.Ft.) 400,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $357,527 5,917,416 kWh $0.06
Electricity Demand $62,529 13,815 kW-months/year $4.53
Electricity Fees $478 - $ -
Natural Gas $67,913 8,718 MMBtu $7.79
TOTAL ENERGY COSTS $496,347
RECOMMENDED SAVINGS* $14,704 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,665
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$85
Cost:
-
$58 960 $27 6 - - - - - - - - $58
960
kWh
$27
6
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,848
Cost:
$517
$1,848 30,801 - - - - - - - - - - $1,848
30,801
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,655
Cost:
$2,760
$4,655 77,584 - - - - - - - - - - $4,655
77,584
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$469
Cost:
$346
$158 2,628 $18 4 - - - - $123 - $170 - $158
2,628
kWh
$18
4
kW-months/year
-
-
$
-
-
MMBtu
$123
-
$
$170
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$693
Cost:
$895
- - - - - - $693 89 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$693
89
MMBtu
-
-
$
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$290
Cost:
$596
$290 4,837 - - - - - - - - - - $290
4,837
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,664
Cost:
$33,352
- - - - $6,664 - - - - - - - -
-
kWh
-
-
kW-months/year
$6,664
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,704
Cost:
$38,466
$7,009 116,810 $45 10 $6,664 - $693 89 $123 - $170 - $7,009
116,810
kWh
$45
10
kW-months/year
$6,664
-
$
$693
89
MMBtu
$123
-
$
$170
-
$
TOTAL IMPLEMENTED Savings:
$7,665
Cost:
$4,518
$6,661 111,013 $18 4 - - $693 89 $123 - $170 - $6,661
111,013
kWh
$18
4
kW-months/year
-
-
$
$693
89
MMBtu
$123
-
$
$170
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $