IAC logo
IAC Assessment: SU0346
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0346
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2013
Principal Product Automotive Tires
NAICS 326211 - Tire Manufacturing (except Retreading)
SIC 3011 - Tires And Inner Tubes
Sales >$500,000,000
# of Employees 1,323
Plant Area (Sq.Ft.) 2,000,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 8,280
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,483,736 89,674,716 kWh $0.05
Electricity Demand $1,268,784 158,598 kW-months/year $8.00
Electricity Fees $166,153 - $ -
Natural Gas $2,981,865 581,871 MMBtu $5.12
TOTAL ENERGY COSTS $8,900,538
RECOMMENDED SAVINGS* $41,064 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,456
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$24,796
Cost:
-
$8,684 173,672 $16,112 2,014 - - - - $8,684
173,672
kWh
$16,112
2,014
kW-months/year
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$119
Cost:
-
$119 2,384 - - - - - - $119
2,384
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,608
Cost:
$780
$6,251 125,028 $1,448 181 $1,495 - $414 - $6,251
125,028
kWh
$1,448
181
kW-months/year
$1,495
-
$
$414
-
$
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$304
Cost:
$1,295
$248 4,968 $56 7 - - - - $248
4,968
kWh
$56
7
kW-months/year
-
-
$
-
-
$
05: 2.7122 DISCONNECT BALLASTS Savings:
$4,434
Cost:
$21,152
$3,602 72,036 $832 104 - - - - $3,602
72,036
kWh
$832
104
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,803
Cost:
$8,868
$869 17,388 $200 25 $390 - $344 - $869
17,388
kWh
$200
25
kW-months/year
$390
-
$
$344
-
$
TOTAL RECOMMENDED Savings:
$41,064
Cost:
$32,095
$19,773 395,476 $18,648 2,331 $1,885 - $758 - $19,773
395,476
kWh
$18,648
2,331
kW-months/year
$1,885
-
$
$758
-
$
TOTAL IMPLEMENTED Savings:
$31,456
Cost:
$31,315
$13,522 270,448 $17,200 2,150 $390 - $344 - $13,522
270,448
kWh
$17,200
2,150
kW-months/year
$390
-
$
$344
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost