IAC logo
IAC Assessment: SU0356
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0356
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2014
Principal Product Deli Meats, Hams, Sausage and Hot Dogs
NAICS 311613 - Rendering and Meat Byproduct Processing
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 169,000
Annual Production 57,200,000 Pounds
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $347,534 18,128,613 kWh $0.02
Electricity Demand $284,955 36,712 kW-months/year $7.76
Natural Gas $777,929 190,014 MMBtu $4.09
TOTAL ENERGY COSTS $1,410,418
RECOMMENDED SAVINGS* $145,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,526
Cost:
-
- - - - $1,526 373 - - - - -
-
kWh
-
-
kW-months/year
$1,526
373
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$609
Cost:
-
$609 32,033 - - - - - - - - $609
32,033
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$128,704
Cost:
$104,500
- - - - $128,704 31,468 - - - - -
-
kWh
-
-
kW-months/year
$128,704
31,468
MMBtu
-
-
$
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$3,970
Cost:
$2,341
$(-1,846) (-97,200) $(-280) (-36) - - $2,645 - $3,451 - $(-1,846)
(-97,200)
kWh
$(-280)
(-36)
kW-months/year
-
-
MMBtu
$2,645
-
$
$3,451
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,282
Cost:
$3,539
$3,079 162,060 $1,723 222 - - $150 - $330 - $3,079
162,060
kWh
$1,723
222
kW-months/year
-
-
MMBtu
$150
-
$
$330
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,768
Cost:
$1,900
$2,768 145,670 - - - - - - - - $2,768
145,670
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$637
Cost:
$472
$73 3,855 $41 5 - - $382 - $141 - $73
3,855
kWh
$41
5
kW-months/year
-
-
MMBtu
$382
-
$
$141
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,264
Cost:
$951
- - - - $1,264 309 - - - - -
-
kWh
-
-
kW-months/year
$1,264
309
MMBtu
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$577
Cost:
$715
$577 30,353 - - - - - - - - $577
30,353
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$145,337
Cost:
$114,418
$5,260 276,771 $1,484 191 $131,494 32,150 $3,177 - $3,922 - $5,260
276,771
kWh
$1,484
191
kW-months/year
$131,494
32,150
MMBtu
$3,177
-
$
$3,922
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost