IAC logo
IAC Assessment: SU0363
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0363
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2014
Principal Product Signs, Tags, Labels
NAICS 339950 - Sign Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 225
Plant Area (Sq.Ft.) 123,000
Annual Production 234,000 Pieces
Production Hrs. Annual 4,550
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,999 1,554,074 kWh $0.06
Electricity Demand $52,245 5,025 kW-months/year $10.40
Electricity Fees $11,591 - $ -
Natural Gas $36,157 4,455 MMBtu $8.12
TOTAL ENERGY COSTS $200,992
RECOMMENDED SAVINGS* $22,359 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,359
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,835
Cost:
-
- - - - $8,835 1,088 - - - - - - -
-
kWh
-
-
kW-months/year
$8,835
1,088
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,805
Cost:
-
- - - - - - - - $7,805 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$7,805
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$419
Cost:
$40
$419 5,989 - - - - - - - - - - $419
5,989
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$942
Cost:
$156
$306 4,368 $62 6 - - $416 - $158 - - - $306
4,368
kWh
$62
6
kW-months/year
-
-
MMBtu
$416
-
$
$158
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$245
Cost:
$101
$245 3,495 - - - - - - - - - - $245
3,495
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$2,875
Cost:
$3,456
$(-71) (-1,014) $(-374) (-36) - - - - $1,280 - $2,040 - $(-71)
(-1,014)
kWh
$(-374)
(-36)
kW-months/year
-
-
MMBtu
-
-
$
$1,280
-
$
$2,040
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$293
Cost:
$732
$293 4,192 - - - - - - - - - - $293
4,192
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$263
Cost:
$810
$263 3,757 - - - - - - - - - - $263
3,757
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$682
Cost:
$3,264
$398 5,687 $156 15 - - - - $32 - $96 - $398
5,687
kWh
$156
15
kW-months/year
-
-
MMBtu
-
-
$
$32
-
$
$96
-
$
TOTAL RECOMMENDED Savings:
$22,359
Cost:
$8,559
$1,853 26,474 $(-156) (-15) $8,835 1,088 $416 - $9,275 - $2,136 - $1,853
26,474
kWh
$(-156)
(-15)
kW-months/year
$8,835
1,088
MMBtu
$416
-
$
$9,275
-
$
$2,136
-
$
TOTAL IMPLEMENTED Savings:
$22,359
Cost:
$8,559
$1,853 26,474 $(-156) (-15) $8,835 1,088 $416 - $9,275 - $2,136 - $1,853
26,474
kWh
$(-156)
(-15)
kW-months/year
$8,835
1,088
MMBtu
$416
-
$
$9,275
-
$
$2,136
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost