IAC logo
IAC Assessment: SU0367
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2014
Principal Product injection molded products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 93
Plant Area (Sq.Ft.) 90,200
Annual Production 1,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,637 5,738,797 kWh $0.04
Electricity Demand $63,139 12,557 kW-months/year $5.03
Electricity Fees $14,002 - $ -
Fuel Oil #2 $48,933 1,964 MMBtu $24.91
TOTAL ENERGY COSTS $368,618
RECOMMENDED SAVINGS* $13,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,722
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,785
Cost:
-
- - - - $3,785 - -
-
kWh
-
-
kW-months/year
$3,785
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,155
Cost:
-
$702 16,875 $453 90 - - $702
16,875
kWh
$453
90
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,427
Cost:
$100
$1,427 34,304 - - - - $1,427
34,304
kWh
-
-
kW-months/year
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,111
Cost:
$527
$1,713 41,184 $398 79 - - $1,713
41,184
kWh
$398
79
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$320
Cost:
$100
$320 7,687 - - - - $320
7,687
kWh
-
-
kW-months/year
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$913
Cost:
$646
$913 21,955 - - - - $913
21,955
kWh
-
-
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$712
Cost:
$582
$61 1,472 $10 2 $641 - $61
1,472
kWh
$10
2
kW-months/year
$641
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,369
Cost:
$3,256
$1,111 26,708 $258 51 - - $1,111
26,708
kWh
$258
51
kW-months/year
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,775
Cost:
$6,702
$1,775 42,670 - - - - $1,775
42,670
kWh
-
-
kW-months/year
-
-
$
10: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$263
Cost:
$1,078
$226 5,331 $37 7 - - $226
5,331
kWh
$37
7
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$13,830
Cost:
$12,991
$8,248 198,186 $1,156 230 $4,426 - $8,248
198,186
kWh
$1,156
230
kW-months/year
$4,426
-
$
TOTAL IMPLEMENTED Savings:
$2,722
Cost:
$1,860
$2,034 48,794 $47 9 $641 - $2,034
48,794
kWh
$47
9
kW-months/year
$641
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost