IAC logo
IAC Assessment: SU0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2014
Principal Product Components and subassemblies for medical and defense applications
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 32,000
Annual Production 61,783 Pieces
Production Hrs. Annual 6,500
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,735 1,077,653 kWh $0.04
Electricity Demand $42,686 2,732 kW-months/year $15.62
Electricity Fees $9,872 - $ -
Natural Gas $5,957 669 MMBtu $8.90
TOTAL ENERGY COSTS $104,050
RECOMMENDED SAVINGS* $15,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,541
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,104
Cost:
-
$354 8,640 $750 48 - - - - $354
8,640
kWh
$750
48
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,078
Cost:
$20,000
$1,078 26,300 - - - - - - $1,078
26,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$463
Cost:
-
- - - - $463 52 - - -
-
kWh
-
-
kW-months/year
$463
52
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,903
Cost:
$1,500
$2,903 70,800 - - - - - - $2,903
70,800
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$765
Cost:
$1,578
$765 18,668 - - - - - - $765
18,668
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,180
Cost:
$15,512
$3,998 97,500 $2,813 180 - - $369 - $3,998
97,500
kWh
$2,813
180
kW-months/year
-
-
MMBtu
$369
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,532
Cost:
$3,780
$1,532 37,375 - - - - - - $1,532
37,375
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$615
Cost:
$3,090
$269 6,570 $281 18 - - $65 - $269
6,570
kWh
$281
18
kW-months/year
-
-
MMBtu
$65
-
$
TOTAL RECOMMENDED Savings:
$15,640
Cost:
$45,460
$10,899 265,853 $3,844 246 $463 52 $434 - $10,899
265,853
kWh
$3,844
246
kW-months/year
$463
52
MMBtu
$434
-
$
TOTAL IMPLEMENTED Savings:
$1,541
Cost:
$20,000
$1,078 26,300 - - $463 52 - - $1,078
26,300
kWh
-
-
kW-months/year
$463
52
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes