Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2014 |
Principal Product | CNC Tool Holders |
NAICS | 333517 - Machine Tool Manufacturing |
SIC | 3541 - Machine Tools, Metal Cutting Types |
Sales | $10,000,000-$50,000,000 |
# of Employees | 123 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 240,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $108,925 | 3,784,050 | kWh | $0.03 |
Electricity Demand | $38,460 | 7,497 | kW-months/year | $5.13 |
Natural Gas | $4,886 | 616 | MMBtu | $7.93 |
TOTAL ENERGY COSTS | $155,609 | |||
RECOMMENDED SAVINGS* | $27,160 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,080 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,507 Cost: - |
- | - | - | - | $1,507 | 190 | - | - |
- - kWh |
- - kW-months/year |
$1,507 190 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $5,979 Cost: $616 |
$5,979 | 207,604 | - | - | - | - | - | - |
$5,979 207,604 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,770 Cost: $2,000 |
$2,770 | 96,195 | - | - | - | - | - | - |
$2,770 96,195 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $379 Cost: $276 |
$68 | 2,365 | $17 | 3 | - | - | $294 | - |
$68 2,365 kWh |
$17 3 kW-months/year |
- - MMBtu |
$294 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $15,433 Cost: $39,216 |
$11,908 | 413,472 | $2,906 | 566 | - | - | $619 | - |
$11,908 413,472 kWh |
$2,906 566 kW-months/year |
- - MMBtu |
$619 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $931 Cost: $2,604 |
$(-135) | (-4,680) | $(-92) | (-18) | $1,158 | 146 | - | - |
$(-135) (-4,680) kWh |
$(-92) (-18) kW-months/year |
$1,158 146 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $161 Cost: $615 |
$161 | 5,573 | - | - | - | - | - | - |
$161 5,573 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,160 Cost: $45,327 |
$20,751 | 720,529 | $2,831 | 552 | $2,665 | 336 | $913 | - | $20,751 720,529 kWh |
$2,831 552 kW-months/year |
$2,665 336 MMBtu |
$913 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,080 Cost: $4,880 |
$2,703 | 93,880 | $(-75) | (-15) | $1,158 | 146 | $294 | - | $2,703 93,880 kWh |
$(-75) (-15) kW-months/year |
$1,158 146 MMBtu |
$294 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |