IAC logo
IAC Assessment: SU0381
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0381
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2015
Principal Product Point of Sale Systems
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3578 - Calculating And Accounting Equipment
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 245,000
Annual Production 20,000 Pieces
Production Hrs. Annual 2,860
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,206 2,528,269 kWh $0.08
Electricity Demand $82,503 8,548 kW-months/year $9.65
Electricity Fees $55,732 - $ -
Natural Gas $5,871 993 MMBtu $5.91
TOTAL ENERGY COSTS $340,312
RECOMMENDED SAVINGS* $29,764 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,142
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,133
Cost:
-
$1,264 16,200 $869 90 - - - - $1,264
16,200
kWh
$869
90
kW-months/year
-
-
$
-
-
$
02: 2.7122 DISCONNECT BALLASTS Savings:
$2,373
Cost:
-
$1,562 20,020 $811 84 - - - - $1,562
20,020
kWh
$811
84
kW-months/year
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,717
Cost:
-
$1,138 14,588 $579 60 - - - - $1,138
14,588
kWh
$579
60
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$452
Cost:
$211
$75 963 $13 1 $250 - $114 - $75
963
kWh
$13
1
kW-months/year
$250
-
$
$114
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,789
Cost:
$5,450
$(-753) (-9,660) $(-347) (-36) $2,025 - $3,864 - $(-753)
(-9,660)
kWh
$(-347)
(-36)
kW-months/year
$2,025
-
$
$3,864
-
$
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$446
Cost:
$958
$381 4,888 $65 7 - - - - $381
4,888
kWh
$65
7
kW-months/year
-
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$460
Cost:
$950
$460 5,903 - - - - - - $460
5,903
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,394
Cost:
$50,904
$14,036 179,945 $3,358 348 - - - - $14,036
179,945
kWh
$3,358
348
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,764
Cost:
$58,473
$18,163 232,847 $5,348 554 $2,275 - $3,978 - $18,163
232,847
kWh
$5,348
554
kW-months/year
$2,275
-
$
$3,978
-
$
TOTAL IMPLEMENTED Savings:
$22,142
Cost:
$52,073
$16,894 216,584 $4,884 506 $250 - $114 - $16,894
216,584
kWh
$4,884
506
kW-months/year
$250
-
$
$114
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost