IAC Assessment: SU0387
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0387
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2015
Principal Product Mass transit and commuter buses
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $100,000,000-$500,000,000
# of Employees 290
Plant Area (Sq.Ft.) 147,500
Annual Production 479 Units
Production Hrs. Annual 4,125
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,007 1,713,192 kWh $0.04
Electricity Demand $38,097 3,890 kW-months/year $9.79
Electricity Fees $61,217 - $ -
Natural Gas $54,412 9,742 MMBtu $5.59
TOTAL ENERGY COSTS $325,680
RECOMMENDED SAVINGS* $41,223 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,803
Cost:
-
$702 18,000 $1,101 113 - - - - - - $702
18,000
kWh
$1,101
113
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,211
Cost:
-
- - - - - - - - $1,211 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,211
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$988
Cost:
$858
$(-59) (-1,516) $(-21) (-2) $1,068 191 - - - - $(-59)
(-1,516)
kWh
$(-21)
(-2)
kW-months/year
$1,068
191
MMBtu
-
-
Tgal
-
-
$
04: 3.4141 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE Savings:
$15,923
Cost:
$25,000
- - - - - - $15,923 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,923
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$776
Cost:
$1,546
$263 6,745 $90 9 - - - - $423 - $263
6,745
kWh
$90
9
kW-months/year
-
-
MMBtu
-
-
Tgal
$423
-
$
06: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$20,522
Cost:
$100,000
$(-105) (-2,683) $(-2,448) (-250) - - - - $23,075 - $(-105)
(-2,683)
kWh
$(-2,448)
(-250)
kW-months/year
-
-
MMBtu
-
-
Tgal
$23,075
-
$
TOTAL RECOMMENDED Savings:
$41,223
Cost:
$127,404
$801 20,546 $(-1,278) (-130) $1,068 191 $15,923 - $24,709 - $801
20,546
kWh
$(-1,278)
(-130)
kW-months/year
$1,068
191
MMBtu
$15,923
-
Tgal
$24,709
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Consumption One-time Revenue or Avoided Cost