IAC Assessment: SU0397
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0397
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2015
Principal Product Metal Fabrication, Machining, Finishing
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 55,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,552 1,233,357 kWh $0.07
Electricity Demand $60,902 4,000 kW-months/year $15.23
Electricity Fees $12,640 - $ -
Natural Gas $60,475 9,572 MMBtu $6.32
TOTAL ENERGY COSTS $219,949
RECOMMENDED SAVINGS* $17,313 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$630
Cost:
$552
$201 2,891 $60 4 - - $264 - $105 - $201
2,891
kWh
$60
4
kW-months/year
-
-
MMBtu
$264
-
$
$105
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,191
Cost:
$1,220
$1,191 17,156 - - - - - - - - $1,191
17,156
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,078
Cost:
$16,120
$8,078 116,400 $3,546 233 - - $810 - $1,644 - $8,078
116,400
kWh
$3,546
233
kW-months/year
-
-
MMBtu
$810
-
$
$1,644
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$390
Cost:
$573
$271 3,900 $119 8 - - - - - - $271
3,900
kWh
$119
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$584
Cost:
$1,190
$(-34) (-496) $(-548) (-36) - - $495 - $671 - $(-34)
(-496)
kWh
$(-548)
(-36)
kW-months/year
-
-
MMBtu
$495
-
$
$671
-
$
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$151
Cost:
$330
$116 1,665 $35 2 - - - - - - $116
1,665
kWh
$35
2
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$131
Cost:
$357
$131 1,883 - - - - - - - - $131
1,883
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7314 REDUCE VENTILATION AIR Savings:
$158
Cost:
$499
$46 656 - - $112 18 - - - - $46
656
kWh
-
-
kW-months/year
$112
18
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$17,313
Cost:
$20,841
$10,000 144,055 $3,212 211 $112 18 $1,569 - $2,420 - $10,000
144,055
kWh
$3,212
211
kW-months/year
$112
18
MMBtu
$1,569
-
$
$2,420
-
$
TOTAL IMPLEMENTED Savings:
$1,972
Cost:
$2,102
$1,508 21,712 $95 6 - - $264 - $105 - $1,508
21,712
kWh
$95
6
kW-months/year
-
-
MMBtu
$264
-
$
$105
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost