IAC Assessment: SU0401
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0401
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2015
Principal Product Heavy Gage Thermoplastic Parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 89
Plant Area (Sq.Ft.) 84,200
Annual Production 1,000 Units
Production Hrs. Annual 4,160
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,595 1,233,009 kWh $0.06
Electricity Demand $68,890 5,875 kW-months/year $11.73
Electricity Fees $4,278 - $ -
Natural Gas $84,871 14,913 MMBtu $5.69
LPG $5,611 182 MMBtu $30.83
Fuel Oil #2 $13,143 827 MMBtu $15.89
TOTAL ENERGY COSTS $255,388
RECOMMENDED SAVINGS* $30,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,282
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,820
Cost:
-
- - - - - - - - $2,820 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,820
-
$
02: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$3,274
Cost:
$1,580
$3,274 51,396 - - - - - - - - $3,274
51,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$964
Cost:
$469
$964 15,130 - - - - - - - - $964
15,130
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$383
Cost:
$240
$234 3,679 $59 5 - - $57 - $33 - $234
3,679
kWh
$59
5
kW-months/year
-
-
MMBtu
$57
-
$
$33
-
$
05: 2.1224 REPLACE BOILER Savings:
$11,805
Cost:
$10,686
- - - - - - - - $11,805 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$11,805
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$218
Cost:
$404
$218 3,416 - - - - - - - - $218
3,416
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$956
Cost:
$3,709
$(-402) (-6,304) $(-633) (-54) - - $828 - $1,163 - $(-402)
(-6,304)
kWh
$(-633)
(-54)
kW-months/year
-
-
MMBtu
$828
-
$
$1,163
-
$
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$9,780
Cost:
$49,000
- - - - $9,780 1,719 - - - - -
-
kWh
-
-
kW-months/year
$9,780
1,719
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,200
Cost:
$66,088
$4,288 67,317 $(-574) (-49) $9,780 1,719 $885 - $15,821 - $4,288
67,317
kWh
$(-574)
(-49)
kW-months/year
$9,780
1,719
MMBtu
$885
-
$
$15,821
-
$
TOTAL IMPLEMENTED Savings:
$18,282
Cost:
$12,506
$3,508 55,075 $59 5 - - $57 - $14,658 - $3,508
55,075
kWh
$59
5
kW-months/year
-
-
MMBtu
$57
-
$
$14,658
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost