IAC logo
IAC Assessment: SU0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2016
Principal Product Millwork
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 30,000
Annual Production 16,000 Pieces
Production Hrs. Annual 2,600
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,921 422,400 kWh $0.06
Electricity Demand $17,046 1,725 kW-months/year $9.88
Electricity Fees $4,615 - $ -
Natural Gas $1,711 299 MMBtu $5.72
TOTAL ENERGY COSTS $48,293
RECOMMENDED SAVINGS* $5,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,072
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,861
Cost:
-
- - - - - - $1,861 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,861
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$609
Cost:
-
- - - - $609 107 - - -
-
kWh
-
-
kW-months/year
$609
107
MMBtu
-
-
$
03: 2.7122 DISCONNECT BALLASTS Savings:
$563
Cost:
-
$318 5,382 $245 25 - - - - $318
5,382
kWh
$245
25
kW-months/year
-
-
MMBtu
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$120
Cost:
-
$97 1,644 $23 2 - - - - $97
1,644
kWh
$23
2
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$337
Cost:
$83
- - - - $337 59 - - -
-
kWh
-
-
kW-months/year
$337
59
MMBtu
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$193
Cost:
$272
$193 3,274 - - - - - - $193
3,274
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7314 REDUCE VENTILATION AIR Savings:
$513
Cost:
$822
$199 3,373 - - $314 55 - - $199
3,373
kWh
-
-
kW-months/year
$314
55
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$297
Cost:
$476
- - - - $297 52 - - -
-
kWh
-
-
kW-months/year
$297
52
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$168
Cost:
$336
$103 1,752 $24 2 - - $41 - $103
1,752
kWh
$24
2
kW-months/year
-
-
MMBtu
$41
-
$
10: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$607
Cost:
$1,364
- - - - - - $607 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$607
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$212
Cost:
$637
$212 3,588 - - - - - - $212
3,588
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,480
Cost:
$3,990
$1,122 19,013 $292 30 $1,557 272 $2,509 - $1,122
19,013
kWh
$292
30
kW-months/year
$1,557
272
MMBtu
$2,509
-
$
TOTAL IMPLEMENTED Savings:
$4,072
Cost:
$2,531
$296 5,026 $24 2 $1,243 218 $2,509 - $296
5,026
kWh
$24
2
kW-months/year
$1,243
218
MMBtu
$2,509
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost