Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2016 |
Principal Product | Flight Research & Development |
NAICS | 541712 - Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) |
SIC | 3721 - Aircraft |
Sales | $10,000,000-$50,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 65,465 |
Annual Production | 10,000 Units |
Production Hrs. Annual | 2,210 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $36,837 | 735,654 | kWh | $0.05 |
Electricity Demand | $25,748 | 2,588 | kW-months/year | $9.95 |
Electricity Fees | $3,122 | - | $ | - |
Natural Gas | $34,079 | 4,897 | MMBtu | $6.96 |
TOTAL ENERGY COSTS | $99,786 | |||
RECOMMENDED SAVINGS* | $25,367 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,788 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $2,414 Cost: - |
$1,160 | 23,205 | $1,254 | 126 | - | - | - | - | - | - |
$1,160 23,205 kWh |
$1,254 126 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7314 REDUCE VENTILATION AIR |
Savings: $3,422 Cost: $10,350 |
$480 | 9,600 | - | - | $2,942 | 423 | - | - | - | - |
$480 9,600 kWh |
- - kW-months/year |
$2,942 423 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,158 Cost: $1,449 |
$263 | 5,256 | $72 | 7 | - | - | $613 | - | $210 | - |
$263 5,256 kWh |
$72 7 kW-months/year |
- - MMBtu |
$613 - $ |
$210 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $3,627 Cost: $6,660 |
$(-255) | (-5,100) | $(-358) | (-36) | - | - | $2,380 | - | $1,860 | - |
$(-255) (-5,100) kWh |
$(-358) (-36) kW-months/year |
- - MMBtu |
$2,380 - $ |
$1,860 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $167 Cost: $235 |
$167 | 3,347 | - | - | - | - | - | - | - | - |
$167 3,347 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,579 Cost: $45,826 |
$9,358 | 187,150 | $6,782 | 682 | - | - | $77 | - | $(-1,638) | - |
$9,358 187,150 kWh |
$6,782 682 kW-months/year |
- - MMBtu |
$77 - $ |
$(-1,638) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $25,367 Cost: $64,520 |
$11,173 | 223,458 | $7,750 | 779 | $2,942 | 423 | $3,070 | - | $432 | - | $11,173 223,458 kWh |
$7,750 779 kW-months/year |
$2,942 423 MMBtu |
$3,070 - $ |
$432 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,788 Cost: $18,694 |
$1,815 | 36,308 | $968 | 97 | $2,942 | 423 | $2,993 | - | $2,070 | - | $1,815 36,308 kWh |
$968 97 kW-months/year |
$2,942 423 MMBtu |
$2,993 - $ |
$2,070 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |