IAC logo
IAC Assessment: SU0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2016
Principal Product Fabricated Structural Metal Manufacturing
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 24
Plant Area (Sq.Ft.) 52,000
Annual Production 33,500,000 Pieces
Production Hrs. Annual 2,168
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,152 354,700 kWh $0.04
Electricity Demand $20,183 1,947 kW-months/year $10.37
Electricity Fees $4,385 - $ -
Natural Gas $2,876 441 MMBtu $6.52
TOTAL ENERGY COSTS $42,596
RECOMMENDED SAVINGS* $10,262 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,942
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$320
Cost:
-
$320 7,444 - - - - - - - - $320
7,444
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,534
Cost:
$429
$1,534 35,671 - - - - - - - - $1,534
35,671
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$2,385
Cost:
$5,280
$(-32) (-750) $(-373) (-36) - - $1,190 - $1,600 - $(-32)
(-750)
kWh
$(-373)
(-36)
kW-months/year
-
-
MMBtu
$1,190
-
$
$1,600
-
$
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$969
Cost:
$2,348
- - - - $969 158 - - - - -
-
kWh
-
-
kW-months/year
$969
158
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$124
Cost:
$418
$124 2,879 - - - - - - - - $124
2,879
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,930
Cost:
$18,947
$2,020 46,981 $2,696 260 - - $694 - $(-481) - $2,020
46,981
kWh
$2,696
260
kW-months/year
-
-
MMBtu
$694
-
$
$(-481)
-
$
TOTAL RECOMMENDED Savings:
$10,262
Cost:
$27,422
$3,966 92,225 $2,323 224 $969 158 $1,884 - $1,119 - $3,966
92,225
kWh
$2,323
224
kW-months/year
$969
158
MMBtu
$1,884
-
$
$1,119
-
$
TOTAL IMPLEMENTED Savings:
$9,942
Cost:
$27,422
$3,646 84,781 $2,323 224 $969 158 $1,884 - $1,119 - $3,646
84,781
kWh
$2,323
224
kW-months/year
$969
158
MMBtu
$1,884
-
$
$1,119
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost