IAC logo
IAC Assessment: SU0425
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0425
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2016
Principal Product Postpress Trade Bindery
NAICS 323120 - Support Activities for Printing
SIC 2789 - Bookbinding And Related Work
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 120,000
Annual Production 2,325,180 Pounds
Production Hrs. Annual 2,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,749 1,254,518 kWh $0.07
Electricity Demand $72,123 4,383 kW-months/year $16.46
Electricity Fees $8,973 - $ -
Natural Gas $18,200 2,919 MMBtu $6.24
TOTAL ENERGY COSTS $181,045
RECOMMENDED SAVINGS* $22,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,702
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,154
Cost:
-
- - - - - - - - $5,154 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$5,154
-
$
02: 2.7122 DISCONNECT BALLASTS Savings:
$204
Cost:
-
$86 1,326 $118 7 - - - - - - $86
1,326
kWh
$118
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$1,946
Cost:
$852
$1,946 29,941 - - - - - - - - $1,946
29,941
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$5,242
Cost:
$3,294
$1,065 16,386 - - $4,177 678 - - - - $1,065
16,386
kWh
-
-
kW-months/year
$4,177
678
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$506
Cost:
$396
$251 3,854 $87 5 - - $73 - $95 - $251
3,854
kWh
$87
5
kW-months/year
-
-
MMBtu
$73
-
$
$95
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,344
Cost:
$4,750
$715 10,998 $1,629 99 - - - - - - $715
10,998
kWh
$1,629
99
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,298
Cost:
$2,828
$1,298 19,962 - - - - - - - - $1,298
19,962
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,941
Cost:
$13,422
$2,428 37,349 $3,337 203 - - $145 - $31 - $2,428
37,349
kWh
$3,337
203
kW-months/year
-
-
MMBtu
$145
-
$
$31
-
$
TOTAL RECOMMENDED Savings:
$22,635
Cost:
$25,542
$7,789 119,816 $5,171 314 $4,177 678 $218 - $5,280 - $7,789
119,816
kWh
$5,171
314
kW-months/year
$4,177
678
MMBtu
$218
-
$
$5,280
-
$
TOTAL IMPLEMENTED Savings:
$7,702
Cost:
$4,750
$801 12,324 $1,747 106 - - - - $5,154 - $801
12,324
kWh
$1,747
106
kW-months/year
-
-
MMBtu
-
-
$
$5,154
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost