Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2017 |
Principal Product | Contract Machine Shop |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 88 |
Plant Area (Sq.Ft.) | 41,764 |
Annual Production | 390,363 Units |
Production Hrs. Annual | 7,248 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $77,900 | 1,279,350 | kWh | $0.06 |
Electricity Demand | $57,693 | 1,998 | kW-months/year | $28.88 |
Electricity Fees | $4,904 | - | $ | - |
LPG | $16,646 | 954 | MMBtu | $17.45 |
Fuel Oil #2 | $4,603 | 337 | MMBtu | $13.66 |
TOTAL ENERGY COSTS | $161,746 | |||
RECOMMENDED SAVINGS* | $20,753 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,622 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | LPG | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7122 DISCONNECT BALLASTS |
Savings: $95 Cost: - |
$26 | 426 | $69 | 2 | - | - | - | - | - | - |
$26 426 kWh |
$69 2 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,538 Cost: $388 |
$4,538 | 74,391 | - | - | - | - | - | - | - | - |
$4,538 74,391 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS |
Savings: $3,447 Cost: $2,277 |
$3,447 | 56,513 | - | - | - | - | - | - | - | - |
$3,447 56,513 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $800 Cost: $741 |
$283 | 4,643 | $185 | 6 | - | - | $226 | - | $106 | - |
$283 4,643 kWh |
$185 6 kW-months/year |
- - MMBtu |
$226 - $ |
$106 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $4,066 Cost: $4,830 |
$(-15) | (-253) | $(-693) | (-24) | - | - | $3,623 | - | $1,151 | - |
$(-15) (-253) kWh |
$(-693) (-24) kW-months/year |
- - MMBtu |
$3,623 - $ |
$1,151 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $5,893 Cost: $8,240 |
$(-783) | (-12,830) | $(-2,033) | (-70) | $8,709 | 499 | - | - | - | - |
$(-783) (-12,830) kWh |
$(-2,033) (-70) kW-months/year |
$8,709 499 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $486 Cost: $719 |
$243 | 3,985 | $191 | 7 | - | - | $48 | - | $4 | - |
$243 3,985 kWh |
$191 7 kW-months/year |
- - MMBtu |
$48 - $ |
$4 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $214 Cost: $533 |
$214 | 3,504 | - | - | - | - | - | - | - | - |
$214 3,504 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,214 Cost: $3,195 |
$1,214 | 19,903 | - | - | - | - | - | - | - | - |
$1,214 19,903 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,753 Cost: $20,923 |
$9,167 | 150,282 | $(-2,281) | (-79) | $8,709 | 499 | $3,897 | - | $1,261 | - | $9,167 150,282 kWh |
$(-2,281) (-79) kW-months/year |
$8,709 499 MMBtu |
$3,897 - $ |
$1,261 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,622 Cost: $11,043 |
$4,955 | 81,232 | $(-439) | (-15) | - | - | $3,849 | - | $1,257 | - | $4,955 81,232 kWh |
$(-439) (-15) kW-months/year |
- - MMBtu |
$3,849 - $ |
$1,257 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | LPG | Personnel Changes | One-time Revenue or Avoided Cost |