IAC logo
IAC Assessment: SU0438
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0438
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2017
Principal Product Airport Lighting/ BMF metal forms
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 125,000
Annual Production 90,000 Units
Production Hrs. Annual 2,340
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,384 1,157,040 kWh $0.03
Electricity Demand $45,883 4,823 kW-months/year $9.51
Electricity Fees $6,268 - $ -
Natural Gas $41,452 10,244 MMBtu $4.05
TOTAL ENERGY COSTS $129,987
RECOMMENDED SAVINGS* $7,274 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,149
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,956
Cost:
$2,304
$(-58) (-1,875) $343 36 - - $1,176 - $3,495 - $(-58)
(-1,875)
kWh
$343
36
kW-months/year
-
-
MMBtu
$1,176
-
$
$3,495
-
$
02: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$467
Cost:
$936
$467 15,058 - - - - - - - - $467
15,058
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$59
Cost:
$66
$21 666 $9 1 - - $14 - $15 - $21
666
kWh
$9
1
kW-months/year
-
-
MMBtu
$14
-
$
$15
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$449
Cost:
$600
$80 2,568 - - $369 91 - - - - $80
2,568
kWh
-
-
kW-months/year
$369
91
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$169
Cost:
$416
$169 5,442 - - - - - - - - $169
5,442
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,174
Cost:
$3,708
$318 10,260 $856 90 - - - - - - $318
10,260
kWh
$856
90
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$7,274
Cost:
$8,030
$997 32,119 $1,208 127 $369 91 $1,190 - $3,510 - $997
32,119
kWh
$1,208
127
kW-months/year
$369
91
MMBtu
$1,190
-
$
$3,510
-
$
TOTAL IMPLEMENTED Savings:
$2,149
Cost:
$5,310
$886 28,552 $865 91 $369 91 $14 - $15 - $886
28,552
kWh
$865
91
kW-months/year
$369
91
MMBtu
$14
-
$
$15
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost