IAC Assessment: SU0444
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0444
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2017
Principal Product Industrial Forging
NAICS 332111 - Iron and Steel Forging
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 28
Plant Area (Sq.Ft.) 30,000
Annual Production 3,000,000 Units
Production Hrs. Annual 2,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,184 678,882 kWh $0.04
Electricity Demand $44,900 3,633 kW-months/year $12.36
Electricity Fees $3,643 - $ -
Fuel Oil #2 $91,263 6,893 MMBtu $13.24
TOTAL ENERGY COSTS $168,990
RECOMMENDED SAVINGS* $29,562 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,037
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,081
Cost:
-
- - - - $1,081 81 - - - - -
-
kWh
-
-
kW-months/year
$1,081
81
MMBtu
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$527
Cost:
$439
- - - - $527 40 - - - - -
-
kWh
-
-
kW-months/year
$527
40
MMBtu
-
-
$
-
-
$
03: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,675
Cost:
$1,780
$(-58) (-1,350) $(-445) (-36) - - $1,012 - $1,166 - $(-58)
(-1,350)
kWh
$(-445)
(-36)
kW-months/year
-
-
MMBtu
$1,012
-
$
$1,166
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$145
Cost:
$165
$53 1,227 $21 2 - - $41 - $30 - $53
1,227
kWh
$21
2
kW-months/year
-
-
MMBtu
$41
-
$
$30
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$25,853
Cost:
$72,576
- - - - - - - - $25,853 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$25,853
-
$
06: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$162
Cost:
$556
$116 2,716 $46 4 - - - - - - $116
2,716
kWh
$46
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$119
Cost:
$563
$119 2,774 - - - - - - - - $119
2,774
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,562
Cost:
$76,079
$230 5,367 $(-378) (-31) $1,608 121 $1,053 - $27,049 - $230
5,367
kWh
$(-378)
(-31)
kW-months/year
$1,608
121
MMBtu
$1,053
-
$
$27,049
-
$
TOTAL IMPLEMENTED Savings:
$3,037
Cost:
$2,899
$177 4,140 $(-399) (-32) $1,081 81 $1,012 - $1,166 - $177
4,140
kWh
$(-399)
(-32)
kW-months/year
$1,081
81
MMBtu
$1,012
-
$
$1,166
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Fuel Oil #2 Personnel Changes One-time Revenue or Avoided Cost