IAC logo
IAC Assessment: SU0446
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0446
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2017
Principal Product Workstation and Jib Cranes
NAICS 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3536 - Hoists, Cranes, And Monorails
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 119,500
Annual Production 7,500 Units
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,028 1,209,437 kWh $0.05
Electricity Demand $96,503 6,866 kW-months/year $14.06
Electricity Fees $8,680 - $ -
Natural Gas $62,198 10,459 MMBtu $5.95
TOTAL ENERGY COSTS $231,409
RECOMMENDED SAVINGS* $19,529 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,929
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,759
Cost:
-
$1,759 33,187 - - - - - - - - $1,759
33,187
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,711
Cost:
$7,161
$17,363 327,600 - - $(-6,652) (-1,118) - - - - $17,363
327,600
kWh
-
-
kW-months/year
$(-6,652)
(-1,118)
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$304
Cost:
$234
$304 5,739 - - - - - - - - $304
5,739
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$170
Cost:
$165
$88 1,664 $32 2 - - $30 - $20 - $88
1,664
kWh
$32
2
kW-months/year
-
-
MMBtu
$30
-
$
$20
-
$
05: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$6,295
Cost:
$18,204
- - - - $6,295 1,058 - - - - -
-
kWh
-
-
kW-months/year
$6,295
1,058
MMBtu
-
-
$
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$290
Cost:
$854
$290 5,474 - - - - - - - - $290
5,474
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,529
Cost:
$26,618
$19,804 373,664 $32 2 $(-357) (-60) $30 - $20 - $19,804
373,664
kWh
$32
2
kW-months/year
$(-357)
(-60)
MMBtu
$30
-
$
$20
-
$
TOTAL IMPLEMENTED Savings:
$1,929
Cost:
$165
$1,847 34,851 $32 2 - - $30 - $20 - $1,847
34,851
kWh
$32
2
kW-months/year
-
-
MMBtu
$30
-
$
$20
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost