IAC Assessment: SU0463
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0463
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2018
Principal Product Zirconias and Titanates
NAICS 327992 - Ground or Treated Mineral and Earth Manufacturing
SIC 3295 - Minerals, Ground Or Treated
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 330,000
Annual Production 4,800,000 Units
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $467,974 33,970,723 kWh $0.01
Electricity Demand $647,012 58,589 kW-months/year $11.04
Electricity Fees $65,060 - $ -
Natural Gas $148,137 34,110 MMBtu $4.34
TOTAL ENERGY COSTS $1,328,183
RECOMMENDED SAVINGS* $69,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,966
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,799
Cost:
$2,040
$3,799 275,309 - - - - - - - - $3,799
275,309
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,444
Cost:
$22,334
$6,990 506,539 $19,744 1,788 - - $1,573 - $(-863) - $6,990
506,539
kWh
$19,744
1,788
kW-months/year
-
-
MMBtu
$1,573
-
$
$(-863)
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$29,334
Cost:
$68,970
$13,834 1,002,456 $15,500 1,404 - - - - - - $13,834
1,002,456
kWh
$15,500
1,404
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,966
Cost:
$4,800
$1,966 140,402 - - - - - - - - $1,966
140,402
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,314
Cost:
$8,600
- - - - $3,314 764 - - - - -
-
kWh
-
-
kW-months/year
$3,314
764
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,345
Cost:
$14,020
$3,345 242,428 - - - - - - - - $3,345
242,428
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$69,202
Cost:
$120,764
$29,934 2,167,134 $35,244 3,192 $3,314 764 $1,573 - $(-863) - $29,934
2,167,134
kWh
$35,244
3,192
kW-months/year
$3,314
764
MMBtu
$1,573
-
$
$(-863)
-
$
TOTAL IMPLEMENTED Savings:
$1,966
Cost:
$4,800
$1,966 140,402 - - - - - - - - $1,966
140,402
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost