IAC logo
IAC Assessment: SU0474
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0474
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2019
Principal Product MOV Disks, Surge Arrestors and Three Phase Gang Switch
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 207,000
Annual Production 2,303,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,308 9,930,930 kWh $0.01
Electricity Demand $86,374 18,132 kW-months/year $4.76
Natural Gas $140,086 33,070 MMBtu $4.24
TOTAL ENERGY COSTS $452,526
RECOMMENDED SAVINGS* $21,987 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,916
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7122 DISCONNECT BALLASTS Savings:
$1,094
Cost:
$3,500
$523 62,375 $571 121 - - - - - - $523
62,375
kWh
$571
121
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,517
Cost:
$2,500
- - - - - - $6,517 1,537 - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,517
1,537
MMBtu
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$425
Cost:
$570
$425 50,601 - - - - - - - - $425
50,601
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$357
Cost:
$650
$39 4,643 $30 6 - - - - $288 - $39
4,643
kWh
$30
6
kW-months/year
-
-
$
-
-
MMBtu
$288
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,523
Cost:
$18,735
- - - - $8,523 - - - - - -
-
kWh
-
-
kW-months/year
$8,523
-
$
-
-
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,071
Cost:
$16,284
- - - - - - $5,071 1,196 - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,071
1,196
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,987
Cost:
$42,239
$987 117,619 $601 127 $8,523 - $11,588 2,733 $288 - $987
117,619
kWh
$601
127
kW-months/year
$8,523
-
$
$11,588
2,733
MMBtu
$288
-
$
TOTAL IMPLEMENTED Savings:
$16,916
Cost:
$25,955
$987 117,619 $601 127 $8,523 - $6,517 1,537 $288 - $987
117,619
kWh
$601
127
kW-months/year
$8,523
-
$
$6,517
1,537
MMBtu
$288
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes