Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2019 |
Principal Product | Power generation equipment and piping |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3399 - Primary Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 58 |
Plant Area (Sq.Ft.) | 51,250 |
Annual Production | 1,000 Units |
Production Hrs. Annual | 3,120 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $46,505 | 698,529 | kWh | $0.07 |
Electricity Demand | $29,185 | 2,842 | kW-months/year | $10.27 |
Electricity Fees | $3,684 | - | $ | - |
Other Gas | $79,265 | 4,002 | MMBtu | $19.81 |
TOTAL ENERGY COSTS | $158,639 | |||
RECOMMENDED SAVINGS* | $12,848 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,323 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Other Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $733 Cost: - |
$733 | 10,951 | - | - | - | - | - | - |
$733 10,951 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,486 Cost: $300 |
- | - | - | - | $1,486 | 81 | - | - |
- - kWh |
- - kW-months/year |
$1,486 81 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,267 Cost: $113 |
$1,206 | 18,000 | $1,386 | 135 | $(-1,325) | 72 | - | - |
$1,206 18,000 kWh |
$1,386 135 kW-months/year |
$(-1,325) 72 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,520 Cost: $500 |
- | - | - | - | $6,520 | 356 | - | - |
- - kWh |
- - kW-months/year |
$6,520 356 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $1,382 Cost: $383 |
- | - | - | - | $1,382 | 75 | - | - |
- - kWh |
- - kW-months/year |
$1,382 75 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $584 Cost: $500 |
- | - | - | - | $584 | 32 | - | - |
- - kWh |
- - kW-months/year |
$584 32 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $453 Cost: $301 |
$223 | 3,329 | $47 | 5 | - | - | $183 | - |
$223 3,329 kWh |
$47 5 kW-months/year |
- - MMBtu |
$183 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $423 Cost: $714 |
$423 | 6,314 | - | - | - | - | - | - |
$423 6,314 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,848 Cost: $2,811 |
$2,585 | 38,594 | $1,433 | 140 | $8,647 | 616 | $183 | - | $2,585 38,594 kWh |
$1,433 140 kW-months/year |
$8,647 616 MMBtu |
$183 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,323 Cost: $1,300 |
$733 | 10,951 | - | - | $8,590 | 468 | - | - | $733 10,951 kWh |
- - kW-months/year |
$8,590 468 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Other Gas | One-time Revenue or Avoided Cost |