IAC logo
IAC Assessment: SU0481
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0481
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2019
Principal Product Ice Cream
NAICS 311520 - Ice Cream and Frozen Dessert Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 250,000
Annual Production 8,700 Thousand Gallons
Production Hrs. Annual 7,200
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,311,522 37,492,736 kWh $0.03
Electricity Demand $1,031,809 73,453 kW-months/year $14.05
Electricity Fees $78,764 - $ -
Natural Gas $296,460 65,166 MMBtu $4.55
TOTAL ENERGY COSTS $5,133,976
RECOMMENDED SAVINGS* $26,631 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,476
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7122 DISCONNECT BALLASTS Savings:
$2,630
Cost:
-
$1,580 45,144 $1,050 75 - - - - - - $1,580
45,144
kWh
$1,050
75
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,034
Cost:
$28
- - - - $1,034 227 - - - - -
-
kWh
-
-
kW-months/year
$1,034
227
MMBtu
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,779
Cost:
$1,023
- - - - $1,779 391 - - - - -
-
kWh
-
-
kW-months/year
$1,779
391
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,137
Cost:
$13,202
$7,280 208,008 $4,871 347 - - - - $(-14) - $7,280
208,008
kWh
$4,871
347
kW-months/year
-
-
MMBtu
-
-
$
$(-14)
-
$
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,649
Cost:
$2,041
$(-14) (-390) $(-337) (-24) - - - - $2,000 - $(-14)
(-390)
kWh
$(-337)
(-24)
kW-months/year
-
-
MMBtu
-
-
$
$2,000
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$305
Cost:
$360
$123 3,504 $67 5 - - $75 - $40 - $123
3,504
kWh
$67
5
kW-months/year
-
-
MMBtu
$75
-
$
$40
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$640
Cost:
$1,168
$640 18,288 - - - - - - - - $640
18,288
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,126
Cost:
$15,784
- - - - $6,126 1,346 - - - - -
-
kWh
-
-
kW-months/year
$6,126
1,346
MMBtu
-
-
$
-
-
$
09: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$331
Cost:
$996
$331 9,471 - - - - - - - - $331
9,471
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$26,631
Cost:
$34,602
$9,940 284,025 $5,651 402 $8,939 1,964 $75 - $2,026 - $9,940
284,025
kWh
$5,651
402
kW-months/year
$8,939
1,964
MMBtu
$75
-
$
$2,026
-
$
TOTAL IMPLEMENTED Savings:
$13,476
Cost:
$13,590
$7,403 211,512 $4,938 351 $1,034 227 $75 - $26 - $7,403
211,512
kWh
$4,938
351
kW-months/year
$1,034
227
MMBtu
$75
-
$
$26
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost