IAC logo
IAC Assessment: SU0483
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0483
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2019
Principal Product Pharma/Food Grade Products
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 3826 - Analytical Instruments
Sales $50,000,000-$100,000,000
# of Employees 124
Plant Area (Sq.Ft.) 122,360
Annual Production 14,000,000 Units
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $203,411 5,657,192 kWh $0.04
Electricity Demand $116,626 10,764 kW-months/year $10.83
Electricity Fees $31,072 - $ -
Natural Gas $527,462 143,592 MMBtu $3.67
TOTAL ENERGY COSTS $1,431,771
RECOMMENDED SAVINGS* $22,799 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,641
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,917
Cost:
-
- - - - - - - - $1,917 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,917
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$498
Cost:
-
$498 13,867 - - - - - - - - $498
13,867
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$8,883
Cost:
$264
- - - - - - - - $8,883 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$8,883
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$975
Cost:
$90
$346 9,600 $780 72 $(-150) 41 - - - - $346
9,600
kWh
$780
72
kW-months/year
$(-150)
41
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,947
Cost:
$624
$1,947 54,086 - - - - - - - - $1,947
54,086
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$86
Cost:
$49
- - - - $86 23 - - - - -
-
kWh
-
-
kW-months/year
$86
23
MMBtu
-
-
$
-
-
$
07: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,545
Cost:
$2,937
$(-48) 1,333 $(-390) 36 - - - - $4,983 - $(-48)
1,333
kWh
$(-390)
36
kW-months/year
-
-
MMBtu
-
-
$
$4,983
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$397
Cost:
$576
$88 2,453 $37 3 - - $182 - $90 - $88
2,453
kWh
$37
3
kW-months/year
-
-
MMBtu
$182
-
$
$90
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,136
Cost:
$5,186
$2,145 59,604 $884 82 - - - - $107 - $2,145
59,604
kWh
$884
82
kW-months/year
-
-
MMBtu
-
-
$
$107
-
$
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$256
Cost:
$460
$256 7,103 - - - - - - - - $256
7,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$110
Cost:
$357
$110 3,066 - - - - - - - - $110
3,066
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$48
Cost:
$163
- - - - $48 13 - - - - -
-
kWh
-
-
kW-months/year
$48
13
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,799
Cost:
$10,706
$5,342 151,112 $1,310 193 $(-16) 77 $182 - $15,980 - $5,342
151,112
kWh
$1,310
193
kW-months/year
$(-16)
77
MMBtu
$182
-
$
$15,980
-
$
TOTAL IMPLEMENTED Savings:
$22,641
Cost:
$10,186
$5,232 148,046 $1,310 193 $(-64) 64 $182 - $15,980 - $5,232
148,046
kWh
$1,310
193
kW-months/year
$(-64)
64
MMBtu
$182
-
$
$15,980
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost