IAC Assessment: SU0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2019
Principal Product Radiators
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 353,403
Annual Production 17,336,652 Units
Production Hrs. Annual 4,160
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $462,988 8,659,916 kWh $0.05
Electricity Demand $100,711 28,587 kW-months/year $3.52
Electricity Fees $13,209 - $ -
Natural Gas $198,793 50,435 MMBtu $3.94
TOTAL ENERGY COSTS $799,201
RECOMMENDED SAVINGS* $41,734 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,213
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$359
Cost:
-
- - - - $359 92 - - - - -
-
kWh
-
-
kW-months/year
$359
92
MMBtu
-
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,163
Cost:
$99
$1,102 20,790 $407 116 $(-346) (-89) - - - - $1,102
20,790
kWh
$407
116
kW-months/year
$(-346)
(-89)
MMBtu
-
-
$
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$4,494
Cost:
$890
$1,431 26,998 - - $3,063 785 - - - - $1,431
26,998
kWh
-
-
kW-months/year
$3,063
785
MMBtu
-
-
$
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$6,082
Cost:
$2,288
$(-210) (-3,952) $(-275) (-78) - - - - $6,566 - $(-210)
(-3,952)
kWh
$(-275)
(-78)
kW-months/year
-
-
MMBtu
-
-
$
$6,566
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,788
Cost:
$21,904
$19,672 371,178 $3,798 1,078 - - - - $3,318 - $19,672
371,178
kWh
$3,798
1,078
kW-months/year
-
-
MMBtu
-
-
$
$3,318
-
$
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$869
Cost:
$845
- - - - $869 223 - - - - -
-
kWh
-
-
kW-months/year
$869
223
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$802
Cost:
$857
$404 7,621 $37 10 - - $191 - $171 - $404
7,621
kWh
$37
10
kW-months/year
-
-
MMBtu
$191
-
$
$171
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$411
Cost:
$839
$411 7,747 - - - - - - - - $411
7,747
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$767
Cost:
$2,060
$767 14,475 - - - - - - - - $767
14,475
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$41,734
Cost:
$29,782
$23,577 444,857 $3,967 1,126 $3,945 1,011 $191 - $10,055 - $23,577
444,857
kWh
$3,967
1,126
kW-months/year
$3,945
1,011
MMBtu
$191
-
$
$10,055
-
$
TOTAL IMPLEMENTED Savings:
$1,213
Cost:
$1,696
$815 15,368 $37 10 - - $191 - $171 - $815
15,368
kWh
$37
10
kW-months/year
-
-
MMBtu
$191
-
$
$171
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost