IAC logo
IAC Assessment: SU0495
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0495
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2020
Principal Product Sheet Metal
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 151,100
Annual Production 988,000 Units
Production Hrs. Annual 5,648
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,933 4,162,583 kWh $0.04
Electricity Demand $194,858 53,881 kW-months/year $3.62
Electricity Fees $23,100 - $ -
Natural Gas $88,750 15,903 MMBtu $5.58
TOTAL ENERGY COSTS $490,641
RECOMMENDED SAVINGS* $25,660 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$703
Cost:
$55
$739 16,800 $380 105 $(-416) 72 - - - - $739
16,800
kWh
$380
105
kW-months/year
$(-416)
72
MMBtu
-
-
$
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$2,795
Cost:
$917
$958 21,767 - - $1,837 329 - - - - $958
21,767
kWh
-
-
kW-months/year
$1,837
329
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$756
Cost:
$547
$756 17,186 - - - - - - - - $756
17,186
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$424
Cost:
$436
$212 4,818 $24 7 - - $77 - $111 - $212
4,818
kWh
$24
7
kW-months/year
-
-
MMBtu
$77
-
$
$111
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$765
Cost:
$1,343
$765 17,393 - - - - - - - - $765
17,393
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,106
Cost:
$7,548
$(-34) (-766) $(-369) (-102) - - $1,936 - $2,573 - $(-34)
(-766)
kWh
$(-369)
(-102)
kW-months/year
-
-
MMBtu
$1,936
-
$
$2,573
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,111
Cost:
$36,548
$14,311 325,257 $4,344 1,200 - - $1,012 - $(-3,556) - $14,311
325,257
kWh
$4,344
1,200
kW-months/year
-
-
MMBtu
$1,012
-
$
$(-3,556)
-
$
TOTAL RECOMMENDED Savings:
$25,660
Cost:
$47,394
$17,707 402,455 $4,379 1,210 $1,421 401 $3,025 - $(-872) - $17,707
402,455
kWh
$4,379
1,210
kW-months/year
$1,421
401
MMBtu
$3,025
-
$
$(-872)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost