IAC Assessment: SU0496
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2020
Principal Product Medicines and Dry Tablet Packaging
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $1,000,000-$5,000,000
# of Employees 200
Plant Area (Sq.Ft.) 620,000
Annual Production 1,000,000 Units
Production Hrs. Annual 8,736
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $637,792 18,824,967 kWh $0.03
Electricity Demand $478,245 40,234 kW-months/year $11.89
Electricity Fees $47,613 - $ -
Natural Gas $118,277 54,623 MMBtu $2.17
TOTAL ENERGY COSTS $1,281,927
RECOMMENDED SAVINGS* $78,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,459
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$255
Cost:
-
- - - - $255 118 - - - - -
-
kWh
-
-
kW-months/year
$255
118
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,574
Cost:
-
$1,574 46,301 - - - - - - - - $1,574
46,301
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$40,299
Cost:
$37,144
- - - - $40,299 18,571 - - - - -
-
kWh
-
-
kW-months/year
$40,299
18,571
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$191
Cost:
$196
- - - - $191 88 - - - - -
-
kWh
-
-
kW-months/year
$191
88
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,753
Cost:
$34,048
$8,994 264,528 $4,989 419 - - - - $20,770 - $8,994
264,528
kWh
$4,989
419
kW-months/year
-
-
MMBtu
-
-
$
$20,770
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$706
Cost:
$845
$226 6,658 $108 9 - - $221 - $151 - $226
6,658
kWh
$108
9
kW-months/year
-
-
MMBtu
$221
-
$
$151
-
$
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$554
Cost:
$1,657
$554 16,290 - - - - - - - - $554
16,290
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$78,332
Cost:
$73,890
$11,348 333,777 $5,097 428 $40,745 18,777 $221 - $20,921 - $11,348
333,777
kWh
$5,097
428
kW-months/year
$40,745
18,777
MMBtu
$221
-
$
$20,921
-
$
TOTAL IMPLEMENTED Savings:
$35,459
Cost:
$34,893
$9,220 271,186 $5,097 428 - - $221 - $20,921 - $9,220
271,186
kWh
$5,097
428
kW-months/year
-
-
MMBtu
$221
-
$
$20,921
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost