IAC Assessment: SU0497
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0497
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2020
Principal Product Boron Nitride
NAICS 327910 - Abrasive Product Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 46
Plant Area (Sq.Ft.) 94,000
Annual Production 322,000 Pounds
Production Hrs. Annual 8,424
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,240 37,349,972 kWh $0.01
Electricity Demand $606,131 102,039 kW-months/year $5.94
Electricity Fees $79,841 - $ -
Natural Gas $108,700 23,943 MMBtu $4.54
Other Gas $3,613 89 MMBtu $40.60
TOTAL ENERGY COSTS $1,095,525
RECOMMENDED SAVINGS* $8,884 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,339
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,000
Cost:
-
$1,000 124,998 - - - - - - $1,000
124,998
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$327
Cost:
$32
$414 51,744 $915 154 $(-1,002) 221 - - $414
51,744
kWh
$915
154
kW-months/year
$(-1,002)
221
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,235
Cost:
$257
- - - - $1,235 272 - - -
-
kWh
-
-
kW-months/year
$1,235
272
MMBtu
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$177
Cost:
$5,032
- - - - $177 39 - - -
-
kWh
-
-
kW-months/year
$177
39
MMBtu
-
-
$
05: 2.7314 REDUCE VENTILATION AIR Savings:
$1,191
Cost:
$882
$112 14,073 - - $1,079 238 - - $112
14,073
kWh
-
-
kW-months/year
$1,079
238
MMBtu
-
-
$
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,415
Cost:
$1,857
$(-9) 1,083 $(-371) 62 - - $1,794 - $(-9)
1,083
kWh
$(-371)
62
kW-months/year
-
-
MMBtu
$1,794
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$302
Cost:
$510
$39 4,818 $39 7 - - $224 - $39
4,818
kWh
$39
7
kW-months/year
-
-
MMBtu
$224
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,107
Cost:
$51,554
$666 83,217 $1,176 198 - - $1,265 - $666
83,217
kWh
$1,176
198
kW-months/year
-
-
MMBtu
$1,265
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$131
Cost:
$4,097
$131 16,326 - - - - - - $131
16,326
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,884
Cost:
$64,221
$2,353 296,259 $1,759 421 $1,489 769 $3,283 - $2,353
296,259
kWh
$1,759
421
kW-months/year
$1,489
769
MMBtu
$3,283
-
$
TOTAL IMPLEMENTED Savings:
$6,339
Cost:
$58,267
$1,231 153,852 $2,130 359 $1,489 769 $1,489 - $1,231
153,852
kWh
$2,130
359
kW-months/year
$1,489
769
MMBtu
$1,489
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost