Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2020 |
Principal Product | Bread |
NAICS | 311812 - Commercial Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 73,524 |
Annual Production | 30,000,000 Units |
Production Hrs. Annual | 8,736 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $272,611 | 3,983,994 | kWh | $0.07 |
Electricity Demand | $95,489 | 15,623 | kW-months/year | $6.11 |
Electricity Fees | $123 | - | $ | - |
Natural Gas | $179,567 | 44,119 | MMBtu | $4.07 |
TOTAL ENERGY COSTS | $547,790 | |||
RECOMMENDED SAVINGS* | $28,744 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,087 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $285 Cost: - |
- | - | - | - | $285 | 70 | - | - | - | - |
- - kWh |
- - kW-months/year |
$285 70 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,803 Cost: - |
$5,803 | 89,210 | - | - | - | - | - | - | - | - |
$5,803 89,210 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $11,303 Cost: $3,012 |
$(-276) | (-4,061) | $(-620) | (-102) | - | - | - | - | $12,199 | - |
$(-276) (-4,061) kWh |
$(-620) (-102) kW-months/year |
- - MMBtu |
- - $ |
$12,199 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $327 Cost: $294 |
$179 | 2,628 | $22 | 4 | - | - | $65 | - | $61 | - |
$179 2,628 kWh |
$22 4 kW-months/year |
- - MMBtu |
$65 - $ |
$61 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $682 Cost: $785 |
$682 | 10,029 | - | - | - | - | - | - | - | - |
$682 10,029 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,087 Cost: $14,773 |
$7,967 | 117,168 | $1,342 | 220 | - | - | $1,556 | - | $(-778) | - |
$7,967 117,168 kWh |
$1,342 220 kW-months/year |
- - MMBtu |
$1,556 - $ |
$(-778) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $257 Cost: $508 |
$257 | 3,778 | - | - | - | - | - | - | - | - |
$257 3,778 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,744 Cost: $19,372 |
$14,612 | 218,752 | $744 | 122 | $285 | 70 | $1,621 | - | $11,482 | - | $14,612 218,752 kWh |
$744 122 kW-months/year |
$285 70 MMBtu |
$1,621 - $ |
$11,482 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,087 Cost: $14,773 |
$7,967 | 117,168 | $1,342 | 220 | - | - | $1,556 | - | $(-778) | - | $7,967 117,168 kWh |
$1,342 220 kW-months/year |
- - MMBtu |
$1,556 - $ |
$(-778) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||