IAC logo
IAC Assessment: SU0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2022
Principal Product Electro-plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 37
Plant Area (Sq.Ft.) 29,000
Annual Production 70,000 Pieces
Production Hrs. Annual 6,205
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,066 1,016,853 kWh $0.05
Electricity Demand $16,970 1,340 kW-months/year $12.66
Electricity Fees $7,711 - $ -
Natural Gas $23,227 4,677 MMBtu $4.97
TOTAL ENERGY COSTS $93,974
RECOMMENDED SAVINGS* $8,599 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,652
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$439
Cost:
-
$439 9,753 - - - - - - $439
9,753
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,098
Cost:
$31
$819 18,200 $665 53 $(-386) (-78) - - $819
18,200
kWh
$665
53
kW-months/year
$(-386)
(-78)
MMBtu
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,957
Cost:
$290
$(-20) (-445) $(-16) (-1) $1,993 401 - - $(-20)
(-445)
kWh
$(-16)
(-1)
kW-months/year
$1,993
401
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$858
Cost:
$160
- - - - - - $858 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$858
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$541
Cost:
$252
$541 12,032 - - - - - - $541
12,032
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$336
Cost:
$194
- - - - $336 68 - - -
-
kWh
-
-
kW-months/year
$336
68
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$857
Cost:
$696
- - $857 68 - - - - -
-
kWh
$857
68
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,406
Cost:
$1,750
$1,406 31,247 - - - - - - $1,406
31,247
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7314 REDUCE VENTILATION AIR Savings:
$1,107
Cost:
$2,030
$216 4,793 - - $891 179 - - $216
4,793
kWh
-
-
kW-months/year
$891
179
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$8,599
Cost:
$5,403
$3,401 75,580 $1,505 119 $2,835 570 $858 - $3,401
75,580
kWh
$1,505
119
kW-months/year
$2,835
570
MMBtu
$858
-
$
TOTAL IMPLEMENTED Savings:
$6,652
Cost:
$3,401
$1,454 32,301 $1,505 119 $2,835 570 $858 - $1,454
32,301
kWh
$1,505
119
kW-months/year
$2,835
570
MMBtu
$858
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost