IAC logo
IAC Assessment: SU0533
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0533
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2023
Principal Product Surgical equipment including electrodes and probes
NAICS 334510 - Electromedical and Electrotherapeutic Apparatus Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 521,200
Annual Production 1,100,000 Units
Production Hrs. Annual 7,488
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $616,315 14,157,462 kWh $0.04
Electricity Demand $163,449 26,644 kW-months/year $6.13
Electricity Fees $82,416 - $ -
Natural Gas $275,642 71,244 MMBtu $3.87
TOTAL ENERGY COSTS $1,137,822
RECOMMENDED SAVINGS* $22,983 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$393
Cost:
-
- - - - $393 102 - - -
-
kWh
-
-
kW-months/year
$393
102
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,173
Cost:
-
- - $8,173 1,332 - - - - -
-
kWh
$8,173
1,332
kW-months/year
-
-
MMBtu
-
-
$
03: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,766
Cost:
-
- - - - - - $1,766 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,766
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$8,707
Cost:
-
$7,117 161,741 $1,590 259 - - - - $7,117
161,741
kWh
$1,590
259
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$79
Cost:
$6
$53 1,200 $46 8 $(-20) (-5) - - $53
1,200
kWh
$46
8
kW-months/year
$(-20)
(-5)
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,768
Cost:
$1,080
$2,768 62,907 - - - - - - $2,768
62,907
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,097
Cost:
$2,011
- - - - $1,097 284 - - -
-
kWh
-
-
kW-months/year
$1,097
284
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,983
Cost:
$3,097
$9,937 225,848 $9,809 1,599 $1,470 380 $1,766 - $9,937
225,848
kWh
$9,809
1,599
kW-months/year
$1,470
380
MMBtu
$1,766
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost