Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas, Arlington |
---|---|
Assessment Year | 2001 |
Principal Product | Prefabricated Homes |
NAICS | n/a |
SIC | 2452 - Prefabricated Wood Buildings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 236 |
Plant Area (Sq.Ft.) | 102,000 |
Annual Production | 2,490 Pieces |
Production Hrs. Annual | 2,117 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $59,020 | 1,129,857 | kWh | $0.05 |
Electricity Demand | $41,857 | 5,296 | kW-months/year | $7.90 |
Electricity Fees | $3,767 | - | $ | - |
Natural Gas | $15,795 | 13,775 | MMBtu | $1.15 |
TOTAL ENERGY COSTS | $120,439 | |||
RECOMMENDED SAVINGS* | $129,244 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $125,299 |
#|Description |
Savings Cost |
Status | Electricity Usage | Water Disposal | Personnel Changes | Administrative Changes | Electricity Usage | Water Disposal | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $91,307 Cost: $1,161 |
$(-1,017) | (-30,456) | - | - | $92,324 | - | - | - |
$(-1,017) (-30,456) kWh |
- - Tgal |
$92,324 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $27,800 Cost: $35 |
- | - | $27,800 | 5,240 | - | - | - | - |
- - kWh |
$27,800 5,240 Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,501 Cost: $919 |
$4,501 | 134,713 | - | - | - | - | - | - |
$4,501 134,713 kWh |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.446 AUTOMATE FINISHING PROCESS |
Savings: $3,432 Cost: $5,220 |
- | - | - | - | $3,432 | - | - | - |
- - kWh |
- - Tgal |
$3,432 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,267 Cost: $1,357 |
$1,267 | 37,928 | - | - | - | - | - | - |
$1,267 37,928 kWh |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $513 Cost: $284 |
$513 | 12,994 | - | - | - | - | - | - |
$513 12,994 kWh |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $424 Cost: - |
- | - | - | - | - | - | $424 | - |
- - kWh |
- - Tgal |
- - $ |
$424 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $129,244 Cost: $8,976 |
$5,264 | 155,179 | $27,800 | 5,240 | $95,756 | - | $424 | - | $5,264 155,179 kWh |
$27,800 5,240 Tgal |
$95,756 - $ |
$424 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $125,299 Cost: $3,472 |
$4,751 | 142,185 | $27,800 | 5,240 | $92,324 | - | $424 | - | $4,751 142,185 kWh |
$27,800 5,240 Tgal |
$92,324 - $ |
$424 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Water Disposal | Personnel Changes | Administrative Changes | Electricity Usage | Water Disposal | Personnel Changes | Administrative Changes |