IAC logo
IAC Assessment: TA0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2001
Principal Product Prefabricated Homes
NAICS n/a
SIC 2452 - Prefabricated Wood Buildings
Sales $50,000,000-$100,000,000
# of Employees 236
Plant Area (Sq.Ft.) 102,000
Annual Production 2,490 Pieces
Production Hrs. Annual 2,117
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,020 1,129,857 kWh $0.05
Electricity Demand $41,857 5,296 kW-months/year $7.90
Electricity Fees $3,767 - $ -
Natural Gas $15,795 13,775 MMBtu $1.15
TOTAL ENERGY COSTS $120,439
RECOMMENDED SAVINGS* $129,244 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,299
#|Description Savings
Cost
Status Electricity Usage Water Disposal Personnel Changes Administrative Changes Electricity Usage Water Disposal Personnel Changes Administrative Changes
$ kWh $ Tgal $ $ $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$91,307
Cost:
$1,161
$(-1,017) (-30,456) - - $92,324 - - - $(-1,017)
(-30,456)
kWh
-
-
Tgal
$92,324
-
$
-
-
$
02: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$27,800
Cost:
$35
- - $27,800 5,240 - - - - -
-
kWh
$27,800
5,240
Tgal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,501
Cost:
$919
$4,501 134,713 - - - - - - $4,501
134,713
kWh
-
-
Tgal
-
-
$
-
-
$
04: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$3,432
Cost:
$5,220
- - - - $3,432 - - - -
-
kWh
-
-
Tgal
$3,432
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,267
Cost:
$1,357
$1,267 37,928 - - - - - - $1,267
37,928
kWh
-
-
Tgal
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$513
Cost:
$284
$513 12,994 - - - - - - $513
12,994
kWh
-
-
Tgal
-
-
$
-
-
$
07: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$424
Cost:
-
- - - - - - $424 - -
-
kWh
-
-
Tgal
-
-
$
$424
-
$
TOTAL RECOMMENDED Savings:
$129,244
Cost:
$8,976
$5,264 155,179 $27,800 5,240 $95,756 - $424 - $5,264
155,179
kWh
$27,800
5,240
Tgal
$95,756
-
$
$424
-
$
TOTAL IMPLEMENTED Savings:
$125,299
Cost:
$3,472
$4,751 142,185 $27,800 5,240 $92,324 - $424 - $4,751
142,185
kWh
$27,800
5,240
Tgal
$92,324
-
$
$424
-
$
Savings
Cost
$ kWh $ Tgal $ $ $ $
Electricity Usage Water Disposal Personnel Changes Administrative Changes Electricity Usage Water Disposal Personnel Changes Administrative Changes