Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas, Arlington |
---|---|
Assessment Year | 2001 |
Principal Product | Automotive Heating and A/C Systems |
NAICS | n/a |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 4,353 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $161,630 | 2,963,215 | kWh | $0.05 |
Electricity Demand | $44,498 | 9,262 | kW-months/year | $4.80 |
Electricity Fees | $10,979 | - | $ | - |
Natural Gas | $37,629 | 4,735 | MMBtu | $7.95 |
TOTAL ENERGY COSTS | $261,036 | |||
RECOMMENDED SAVINGS* | $51,668 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,035 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $27,478 Cost: $2,805 |
- | - | - | - | - | - | - | - | $27,478 | - |
- - kWh |
- - $ |
- - MMBtu |
- - Tgal |
$27,478 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $11,836 Cost: $225 |
- | - | $11,836 | - | - | - | - | - | - | - |
- - kWh |
$11,836 - $ |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $5,994 Cost: $3,000 |
$5,994 | 82,650 | - | - | - | - | - | - | - | - |
$5,994 82,650 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $5,184 Cost: $5,331 |
- | - | - | - | - | - | $5,184 | 5,937 | - | - |
- - kWh |
- - $ |
- - MMBtu |
$5,184 5,937 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,015 Cost: $346 |
$1,015 | 13,995 | - | - | - | - | - | - | - | - |
$1,015 13,995 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $161 Cost: $140 |
- | - | - | - | $161 | 104 | - | - | - | - |
- - kWh |
- - $ |
$161 104 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $51,668 Cost: $11,847 |
$7,009 | 96,645 | $11,836 | - | $161 | 104 | $5,184 | 5,937 | $27,478 | - | $7,009 96,645 kWh |
$11,836 - $ |
$161 104 MMBtu |
$5,184 5,937 Tgal |
$27,478 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,035 Cost: $5,902 |
$1,015 | 13,995 | $11,836 | - | - | - | $5,184 | 5,937 | - | - | $1,015 13,995 kWh |
$11,836 - $ |
- - MMBtu |
$5,184 5,937 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes |