Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2002
Principal Product Lock Sets and Bolts
NAICS n/a
SIC 3429 - Hardware, Nec
Sales $10,000,000-$50,000,000
# of Employees 418
Plant Area (Sq.Ft.) 230,000
Annual Production 1,000,000,000 Pieces
Production Hrs. Annual 6,312
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $754,454 15,197,733 kWh $0.05
Electricity Demand $123,671 36,000 kW-months/year $3.44
Electricity Fees $75,920 - $ -
Natural Gas $656,989 104,962 MMBtu $6.26
TOTAL ENERGY COSTS $1,611,034
RECOMMENDED SAVINGS* $119,415 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $116,290
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$58,202
Cost:
-
$50,700 969,400 $7,502 1,568 - - $50,700
969,400
kWh
$7,502
1,568
kW-months/year
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$49,028
Cost:
$7,280
$41,765 798,569 $7,263 1,518 - - $41,765
798,569
kWh
$7,263
1,518
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,570
Cost:
$1,400
$6,450 123,275 $1,120 234 - - $6,450
123,275
kWh
$1,120
234
kW-months/year
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,695
Cost:
$870
$2,250 48,787 $445 93 - - $2,250
48,787
kWh
$445
93
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,490
Cost:
$223
$1,490 28,564 - - - - $1,490
28,564
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2514 COVER OPEN TANKS Savings:
$430
Cost:
$381
- - - - $430 68 -
-
kWh
-
-
kW-months/year
$430
68
MMBtu
TOTAL RECOMMENDED Savings:
$119,415
Cost:
$10,154
$102,655 1,968,595 $16,330 3,413 $430 68 $102,655
1,968,595
kWh
$16,330
3,413
kW-months/year
$430
68
MMBtu
TOTAL IMPLEMENTED Savings:
$116,290
Cost:
$8,903
$100,405 1,919,808 $15,885 3,320 - - $100,405
1,919,808
kWh
$15,885
3,320
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas