IAC logo
IAC Assessment: TA0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2002
Principal Product Activation Carbon
NAICS n/a
SIC 2898 -
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 8,700,000
Annual Production 90,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,726 9,832,800 kWh $0.03
Electricity Demand $130,222 25,685 kW-months/year $5.07
Electricity Fees $(-4,547) - $ -
Natural Gas $583,892 129,426 MMBtu $4.51
Fuel Oil #1 $39,989 30,761 MMBtu $1.30
TOTAL ENERGY COSTS $1,061,282
RECOMMENDED SAVINGS* $367,509 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $362,373
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Water Consumption Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$306,746
Cost:
$5,202
$306,746 9,380,615 - - - - - - - - $306,746
9,380,615
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$26,355
Cost:
-
$10,069 307,914 $16,286 956 - - - - - - $10,069
307,914
kWh
$16,286
956
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$14,779
Cost:
$6,925
- - - - - - - - $14,779 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$14,779
-
Tgal
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$9,139
Cost:
-
$5,377 164,427 $3,762 223 - - - - - - $5,377
164,427
kWh
$3,762
223
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$4,592
Cost:
-
- - - - $4,592 2,797 - - - - -
-
kWh
-
-
kW-months/year
$4,592
2,797
MMBtu
-
-
$
-
-
Tgal
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,855
Cost:
$778
$3,855 117,878 - - - - - - - - $3,855
117,878
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$720
Cost:
$2,145
- - - - - - - - $720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$720
-
Tgal
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$762
Cost:
-
- - - - - - $762 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$762
-
$
-
-
Tgal
09: 3.2176 INCREASE USE OF AUTOMATION Savings:
$561
Cost:
$87
$561 17,148 - - - - - - - - $561
17,148
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$367,509
Cost:
$15,137
$326,608 9,987,982 $20,048 1,179 $4,592 2,797 $762 - $15,499 - $326,608
9,987,982
kWh
$20,048
1,179
kW-months/year
$4,592
2,797
MMBtu
$762
-
$
$15,499
-
Tgal
TOTAL IMPLEMENTED Savings:
$362,373
Cost:
$12,127
$322,192 9,852,956 $20,048 1,179 $4,592 2,797 $762 - $14,779 - $322,192
9,852,956
kWh
$20,048
1,179
kW-months/year
$4,592
2,797
MMBtu
$762
-
$
$14,779
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Water Consumption Electricity Usage Electricity Demand Fuel Oil #1 Administrative Changes Water Consumption