IAC Assessment: TA0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2003
Principal Product Metal Machine Parts
NAICS 332710 - Machine Shops
SIC 3451 - Screw Machine Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 75,000
Annual Production 4,200,000 Pounds
Production Hrs. Annual 4,444
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,671 2,677,232 kWh $0.05
Electricity Demand $33,826 7,125 kW-months/year $4.75
Electricity Fees $5,993 - $ -
Natural Gas $13,049 213 MMBtu $61.26
TOTAL ENERGY COSTS $196,439
RECOMMENDED SAVINGS* $607,802 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,002
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes
$ kWh $ kW-months/year $ $ $ Tgal $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$573,800
Cost:
$108,000
- - - - - - - - $573,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$573,800
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$27,239
Cost:
-
- - - - $27,239 - - - - - -
-
kWh
-
-
kW-months/year
$27,239
-
$
-
-
Tgal
-
-
$
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,900
Cost:
-
- - - - - - $3,900 2,600 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,900
2,600
Tgal
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$1,775
Cost:
$3,096
$1,423 27,517 $352 74 - - - - - - $1,423
27,517
kWh
$352
74
kW-months/year
-
-
$
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,088
Cost:
$162
$1,088 20,863 - - - - - - - - $1,088
20,863
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$607,802
Cost:
$111,258
$2,511 48,380 $352 74 $27,239 - $3,900 2,600 $573,800 - $2,511
48,380
kWh
$352
74
kW-months/year
$27,239
-
$
$3,900
2,600
Tgal
$573,800
-
$
TOTAL IMPLEMENTED Savings:
$34,002
Cost:
$3,258
$2,511 48,380 $352 74 $27,239 - $3,900 2,600 - - $2,511
48,380
kWh
$352
74
kW-months/year
$27,239
-
$
$3,900
2,600
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $
Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes Electricity Usage Electricity Demand Electricity Fees Water Disposal Administrative Changes