IAC Assessment: TA0070
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2004
Principal Product Plastic Products
NAICS 333511 - Industrial Mold Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 130,000
Annual Production 325,000 Pieces
Production Hrs. Annual 6,288
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $308,739 5,488,216 kWh $0.06
Electricity Demand $53,496 12,466 kW-months/year $4.29
Electricity Fees $24,057 - $ -
TOTAL ENERGY COSTS $386,292
RECOMMENDED SAVINGS* $88,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,025
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$43,350
Cost:
-
- - - - - - $43,350 - -
-
kWh
-
-
kW-months/year
-
-
$
$43,350
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$21,150
Cost:
$(-21,150)
- - - - $21,150 - - - -
-
kWh
-
-
kW-months/year
$21,150
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,300
Cost:
-
$7,300 120,600 - - - - - - $7,300
120,600
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,100
Cost:
$590
$2,740 45,270 $360 86 - - - - $2,740
45,270
kWh
$360
86
kW-months/year
-
-
$
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,990
Cost:
$130
$2,990 49,390 - - - - - - $2,990
49,390
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$2,650
Cost:
-
$2,300 37,964 $350 82 - - - - $2,300
37,964
kWh
$350
82
kW-months/year
-
-
$
-
-
$
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,088
Cost:
-
$2,088 34,483 - - - - - - $2,088
34,483
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,020
Cost:
$410
$2,020 33,325 - - - - - - $2,020
33,325
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,885
Cost:
$50
$1,665 27,489 $220 52 - - - - $1,665
27,489
kWh
$220
52
kW-months/year
-
-
$
-
-
$
10: 2.7122 DISCONNECT BALLASTS Savings:
$1,030
Cost:
$200
$910 15,090 $120 28 - - - - $910
15,090
kWh
$120
28
kW-months/year
-
-
$
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$680
Cost:
$290
$680 11,288 - - - - - - $680
11,288
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$88,243
Cost:
$(-19,480)
$22,693 374,899 $1,050 248 $21,150 - $43,350 - $22,693
374,899
kWh
$1,050
248
kW-months/year
$21,150
-
$
$43,350
-
$
TOTAL IMPLEMENTED Savings:
$82,025
Cost:
$(-20,270)
$16,955 280,056 $570 134 $21,150 - $43,350 - $16,955
280,056
kWh
$570
134
kW-months/year
$21,150
-
$
$43,350
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes