IAC Assessment: TA0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2004
Principal Product Concrete Products
NAICS 327332 - Concrete Pipe Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 1
Annual Production 280,000,000 Pounds
Production Hrs. Annual 2,376
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,847 5,748,924 kWh $0.05
Electricity Demand $57,232 13,409 kW-months/year $4.27
Electricity Fees $(-18,731) - $ -
Natural Gas $393,840 67,507 MMBtu $5.83
TOTAL ENERGY COSTS $703,188
RECOMMENDED SAVINGS* $96,826 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $96,826
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$67,776
Cost:
$13,000
$67,776 1,139,951 - - - - $67,776
1,139,951
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,160
Cost:
$585
$14,726 247,675 $1,434 339 - - $14,726
247,675
kWh
$1,434
339
kW-months/year
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$7,900
Cost:
$875
- - - - $7,900 1,355 -
-
kWh
-
-
kW-months/year
$7,900
1,355
MMBtu
04: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$3,990
Cost:
$1,600
$3,690 62,082 $300 71 - - $3,690
62,082
kWh
$300
71
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,000
Cost:
$1,000
- - - - $1,000 172 -
-
kWh
-
-
kW-months/year
$1,000
172
MMBtu
TOTAL RECOMMENDED Savings:
$96,826
Cost:
$17,060
$86,192 1,449,708 $1,734 410 $8,900 1,527 $86,192
1,449,708
kWh
$1,734
410
kW-months/year
$8,900
1,527
MMBtu
TOTAL IMPLEMENTED Savings:
$96,826
Cost:
$17,060
$86,192 1,449,708 $1,734 410 $8,900 1,527 $86,192
1,449,708
kWh
$1,734
410
kW-months/year
$8,900
1,527
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas