Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas, Arlington |
---|---|
Assessment Year | 2004 |
Principal Product | Saw Cut Lumber and Crates |
NAICS | 321113 - Sawmills |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 23,000 |
Annual Production | 63,000 Thousand Feet |
Production Hrs. Annual | 2,379 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $46,943 | 620,480 | kWh | $0.08 |
Electricity Demand | $8,277 | 4,244 | kW-months/year | $1.95 |
Electricity Fees | $300 | - | $ | - |
TOTAL ENERGY COSTS | $57,440 | |||
RECOMMENDED SAVINGS* | $163,080 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $280 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.512 CONDENSE OPERATION INTO ONE BUILDING |
Savings: $91,320 Cost: $20,000 |
- | - | - | - | $31,320 | - | $60,000 | - | - | - |
- - kWh |
- - lb |
$31,320 - $ |
$60,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $42,810 Cost: $64,000 |
- | - | - | - | $42,810 | - | - | - | - | - |
- - kWh |
- - lb |
$42,810 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $23,490 Cost: $45,000 |
- | - | - | - | $23,490 | - | - | - | - | - |
- - kWh |
- - lb |
$23,490 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: $2,350 Cost: - |
- | - | - | - | - | - | - | - | $2,350 | - |
- - kWh |
- - lb |
- - $ |
- - $ |
$2,350 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $1,920 Cost: $120 |
- | - | $1,920 | 5,000 | - | - | - | - | - | - |
- - kWh |
$1,920 5,000 lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $910 Cost: $8 |
$910 | 10,872 | - | - | - | - | - | - | - | - |
$910 10,872 kWh |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $280 Cost: $120 |
$280 | 3,367 | - | - | - | - | - | - | - | - |
$280 3,367 kWh |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $163,080 Cost: $129,248 |
$1,190 | 14,239 | $1,920 | 5,000 | $97,620 | - | $60,000 | - | $2,350 | - | $1,190 14,239 kWh |
$1,920 5,000 lb |
$97,620 - $ |
$60,000 - $ |
$2,350 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $280 Cost: $120 |
$280 | 3,367 | - | - | - | - | - | - | - | - | $280 3,367 kWh |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Primary Product | By-product Production |