IAC logo
IAC Assessment: TA0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TA0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas, Arlington
Assessment Year 2006
Principal Product Aluminum Extrude product
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 310
Plant Area (Sq.Ft.) 260,000
Annual Production 500 Tons
Production Hrs. Annual 4,832
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,191 1,356,356 kWh $0.09
Electricity Demand $43,893 6,079 kW-months/year $7.22
Natural Gas $69,293 13,990 MMBtu $4.95
TOTAL ENERGY COSTS $239,377
RECOMMENDED SAVINGS* $26,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,218
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$8,070
Cost:
$3,858
- - - - - - $8,070 1,617 -
-
kWh
-
-
kW-months/year
-
-
$
$8,070
1,617
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,660
Cost:
$1,120
$4,320 78,350 $1,340 293 - - - - $4,320
78,350
kWh
$1,340
293
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,950
Cost:
-
$3,275 59,477 $675 147 - - - - $3,275
59,477
kWh
$675
147
kW-months/year
-
-
$
-
-
MMBtu
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,528
Cost:
-
- - - - $3,528 - - - -
-
kWh
-
-
kW-months/year
$3,528
-
$
-
-
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,600
Cost:
$1,820
- - - - - - $2,600 522 -
-
kWh
-
-
kW-months/year
-
-
$
$2,600
522
MMBtu
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,900
Cost:
$685
$1,900 34,781 - - - - - - $1,900
34,781
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$455
Cost:
-
$300 5,421 $155 19 - - - - $300
5,421
kWh
$155
19
kW-months/year
-
-
$
-
-
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$410
Cost:
-
$410 7,450 - - - - - - $410
7,450
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,573
Cost:
$7,483
$10,205 185,479 $2,170 459 $3,528 - $10,670 2,139 $10,205
185,479
kWh
$2,170
459
kW-months/year
$3,528
-
$
$10,670
2,139
MMBtu
TOTAL IMPLEMENTED Savings:
$24,218
Cost:
$6,798
$8,005 145,277 $2,015 440 $3,528 - $10,670 2,139 $8,005
145,277
kWh
$2,015
440
kW-months/year
$3,528
-
$
$10,670
2,139
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas