IAC logo
IAC Assessment: TN0224
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0224
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product LADIES SPORTSWEAR
NAICS n/a
SIC 2339 - Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 728,000 Pieces
Production Hrs. Annual 2,250
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,425 1,260,844 kWh $0.07
Natural Gas $44,990 7,871 MMBtu $5.72
TOTAL ENERGY COSTS $132,415
RECOMMENDED SAVINGS* $11,905 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,552
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,967
Cost:
$2,192
- - $3,967 696 -
-
kWh
$3,967
696
MMBtu
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$6,188
Cost:
-
$6,188 89,683 - - $6,188
89,683
kWh
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,117
Cost:
$3,860
- - $1,117 196 -
-
kWh
$1,117
196
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$353
Cost:
$265
- - $353 62 -
-
kWh
$353
62
MMBtu
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$137
Cost:
$86
- - $137 24 -
-
kWh
$137
24
MMBtu
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$143
Cost:
$150
- - $143 25 -
-
kWh
$143
25
MMBtu
TOTAL RECOMMENDED Savings:
$11,905
Cost:
$6,553
$6,188 89,683 $5,717 1,003 $6,188
89,683
kWh
$5,717
1,003
MMBtu
TOTAL IMPLEMENTED Savings:
$11,552
Cost:
$6,288
$6,188 89,683 $5,364 941 $6,188
89,683
kWh
$5,364
941
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas