IAC logo
IAC Assessment: TN0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1984
Principal Product LEATHER TANNING
NAICS n/a
SIC 3111 - Leather Tanning And Finishing
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Pieces
Production Hrs. Annual 4,250
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,835 4,395,956 kWh $0.05
Natural Gas $869,276 163,889 MMBtu $5.30
LPG $11,762 1,191 MMBtu $9.88
TOTAL ENERGY COSTS $1,095,873
RECOMMENDED SAVINGS* $225,678 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $221,146
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$155,565
Cost:
$49,200
$(-18,158) (-371,630) $173,723 32,778 - - $(-18,158)
(-371,630)
kWh
$173,723
32,778
MMBtu
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$17,034
Cost:
$300
- - $17,034 3,214 - - -
-
kWh
$17,034
3,214
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$10,346
Cost:
-
- - $11,146 2,103 $(-800) - -
-
kWh
$11,146
2,103
MMBtu
$(-800)
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$13,854
Cost:
$1,011
- - $13,854 2,614 - - -
-
kWh
$13,854
2,614
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$16,218
Cost:
$2,000
- - $16,218 3,060 - - -
-
kWh
$16,218
3,060
MMBtu
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$4,463
Cost:
$300
- - $4,463 842 - - -
-
kWh
$4,463
842
MMBtu
-
-
$
07: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$3,149
Cost:
$3,230
$(-243) (-4,982) $3,392 640 - - $(-243)
(-4,982)
kWh
$3,392
640
MMBtu
-
-
$
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,383
Cost:
$106
- - $1,383 261 - - -
-
kWh
$1,383
261
MMBtu
-
-
$
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,408
Cost:
-
$3,408 69,754 - - - - $3,408
69,754
kWh
-
-
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$258
Cost:
$60
$258 5,275 - - - - $258
5,275
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$225,678
Cost:
$56,207
$(-14,735) (-301,583) $241,213 45,512 $(-800) - $(-14,735)
(-301,583)
kWh
$241,213
45,512
MMBtu
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
$221,146
Cost:
$52,871
$(-14,492) (-296,601) $236,438 44,611 $(-800) - $(-14,492)
(-296,601)
kWh
$236,438
44,611
MMBtu
$(-800)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes