IAC logo
IAC Assessment: TN0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1985
Principal Product CLOTHING
NAICS n/a
SIC 2321 - Men's and Boys' Shirts, Except Work Shirts
Sales $1,000,000-$5,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 470,400 Pieces
Production Hrs. Annual 1,960
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,210 318,875 kWh $0.06
Natural Gas $4,486 947 MMBtu $4.74
TOTAL ENERGY COSTS $24,696
RECOMMENDED SAVINGS* $4,378 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,714
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,664
Cost:
$1,400
- - $1,664 351 -
-
kWh
$1,664
351
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,200
Cost:
$75
$1,200 19,050 - - $1,200
19,050
kWh
-
-
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$628
Cost:
-
$628 9,965 - - $628
9,965
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$554
Cost:
$300
$554 8,792 - - $554
8,792
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$129
Cost:
$100
$129 2,052 - - $129
2,052
kWh
-
-
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$111
Cost:
$35
$111 1,758 - - $111
1,758
kWh
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$92
Cost:
-
$92 1,465 - - $92
1,465
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$4,378
Cost:
$1,910
$2,714 43,082 $1,664 351 $2,714
43,082
kWh
$1,664
351
MMBtu
TOTAL IMPLEMENTED Savings:
$2,714
Cost:
$510
$2,714 43,082 - - $2,714
43,082
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas