IAC logo
IAC Assessment: TN0273
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0273
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1986
Principal Product TEXTILE LOOM FIXTURES
NAICS n/a
SIC 3552 - Textile Machinery
Sales $5,000,000-$10,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 8,600,000 Pounds
Production Hrs. Annual 2,750
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $540,601 11,085,874 kWh $0.05
Natural Gas $345,387 62,814 MMBtu $5.50
Coal $353,340 65,052 MMBtu $5.43
TOTAL ENERGY COSTS $1,239,328
RECOMMENDED SAVINGS* $132,770 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,836
#|Description Savings
Cost
Status Electricity Usage Natural Gas Coal Electricity Usage Natural Gas Coal
$ kWh $ MMBtu $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$61,908
Cost:
$4,200
- - $61,908 11,256 - - -
-
kWh
$61,908
11,256
MMBtu
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$35,336
Cost:
$79,000
- - - - $35,336 6,178 -
-
kWh
-
-
MMBtu
$35,336
6,178
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$19,635
Cost:
$2,800
- - $19,635 3,570 - - -
-
kWh
$19,635
3,570
MMBtu
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,293
Cost:
$1,680
$12,293 250,879 - - - - $12,293
250,879
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$1,562
Cost:
$7,200
- - $1,562 284 - - -
-
kWh
$1,562
284
MMBtu
-
-
MMBtu
06: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$1,249
Cost:
-
- - $1,249 227 - - -
-
kWh
$1,249
227
MMBtu
-
-
MMBtu
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$787
Cost:
$87
- - $787 143 - - -
-
kWh
$787
143
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$132,770
Cost:
$94,967
$12,293 250,879 $85,141 15,480 $35,336 6,178 $12,293
250,879
kWh
$85,141
15,480
MMBtu
$35,336
6,178
MMBtu
TOTAL IMPLEMENTED Savings:
$93,836
Cost:
$8,680
$12,293 250,879 $81,543 14,826 - - $12,293
250,879
kWh
$81,543
14,826
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Coal Electricity Usage Natural Gas Coal