Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1987 |
Principal Product | CORR SHIPPING CONTAINERS |
NAICS | n/a |
SIC | 2631 - Paperboard Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 93 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 588,000 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $194,874 | 4,089,097 | kWh | $0.05 |
Natural Gas | $95,596 | 18,250 | MMBtu | $5.24 |
Fuel Oil #2 | $99,237 | 29,862 | MMBtu | $3.32 |
TOTAL ENERGY COSTS | $389,707 | |||
RECOMMENDED SAVINGS* | $27,753 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,832 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Electricity Usage | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $12,846 Cost: - |
$366 | 7,620 | $12,480 | 2,400 | - | - |
$366 7,620 kWh |
$12,480 2,400 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $5,954 Cost: $5,400 |
- | - | $5,954 | 1,145 | - | - |
- - kWh |
$5,954 1,145 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,320 Cost: $190 |
- | - | - | - | $2,320 | 691 |
- - kWh |
- - MMBtu |
$2,320 691 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $1,857 Cost: - |
- | - | - | - | $1,857 | 553 |
- - kWh |
- - MMBtu |
$1,857 553 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,094 Cost: $437 |
- | - | - | - | $1,094 | 326 |
- - kWh |
- - MMBtu |
$1,094 326 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $994 Cost: $300 |
- | - | - | - | $994 | 296 |
- - kWh |
- - MMBtu |
$994 296 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2111 INSTALL STEAM TRAP |
Savings: $883 Cost: $1,900 |
- | - | - | - | $883 | 263 |
- - kWh |
- - MMBtu |
$883 263 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $624 Cost: $68 |
- | - | - | - | $624 | 186 |
- - kWh |
- - MMBtu |
$624 186 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7446 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS |
Savings: $822 Cost: $1,665 |
- | - | $822 | 158 | - | - |
- - kWh |
$822 158 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $359 Cost: - |
- | - | - | - | $359 | 107 |
- - kWh |
- - MMBtu |
$359 107 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,753 Cost: $9,960 |
$366 | 7,620 | $19,256 | 3,703 | $8,131 | 2,422 | $366 7,620 kWh |
$19,256 3,703 MMBtu |
$8,131 2,422 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,832 Cost: $6,395 |
$366 | 7,620 | $18,434 | 3,545 | $5,032 | 1,499 | $366 7,620 kWh |
$18,434 3,545 MMBtu |
$5,032 1,499 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Electricity Usage | Natural Gas | Fuel Oil #2 |