IAC logo
IAC Assessment: TN0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1987
Principal Product LUNCH MEATS, BACON, HAMS
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 16,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,969 3,577,960 kWh $0.05
Natural Gas $69,775 16,540 MMBtu $4.22
TOTAL ENERGY COSTS $248,744
RECOMMENDED SAVINGS* $24,021 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,885
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$12,770
Cost:
$2,128
- - $12,770 3,026 - - -
-
kWh
$12,770
3,026
MMBtu
-
-
$
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$612
Cost:
-
- - $612 145 - - -
-
kWh
$612
145
MMBtu
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$3,136
Cost:
$3,000
$3,136 62,720 - - - - $3,136
62,720
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,136
Cost:
$760
$3,136 62,720 - - - - $3,136
62,720
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,271
Cost:
$4,080
$2,271 45,428 - - - - $2,271
45,428
kWh
-
-
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$254
Cost:
$300
- - $554 132 $(-300) - -
-
kWh
$554
132
MMBtu
$(-300)
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$515
Cost:
$800
- - $515 122 - - -
-
kWh
$515
122
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,099
Cost:
$150
$1,099 21,981 - - - - $1,099
21,981
kWh
-
-
MMBtu
-
-
$
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$228
Cost:
$72
- - $228 54 - - -
-
kWh
$228
54
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,021
Cost:
$11,290
$9,642 192,849 $14,679 3,479 $(-300) - $9,642
192,849
kWh
$14,679
3,479
MMBtu
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$20,885
Cost:
$10,530
$6,506 130,129 $14,679 3,479 $(-300) - $6,506
130,129
kWh
$14,679
3,479
MMBtu
$(-300)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes